Quick answers
What is this project?
This withdrawn mining project by M/s CPT BricksAddress Mauza-Pakri, P.O-Balua Deorhi, P.S- Palsi, Anchal- Palsi, District- Araria(Bihar) having Area 4.50 Acres or 1.821 Ha. is in Pakri Arazi, Palasi, Araria, Bihar. The site covers 4.5 acres.
Who is building it?
The applicant is Pranay Kumar.
Has it been approved?
No. The application was withdrawn on 23 Nov 2025, so it is no longer under consideration.
Where is it?
In Pakri Arazi, Palasi, Araria, Bihar.
How big is it?
It has a stated cost of ₹6 lakh and a site of 4.5 acres.
When was it filed?
The application was filed on 23 Nov 2025.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 23 Nov 2025 |
| Application filed | 23 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pranay Kumar |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Pakri Arazi |
| Taluk / tehsil | Palasi |
| District | Araria |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01357 |
In context
46 applications in Araria since January 2022 are in the same category (Mining): 38 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 4.5 acres, this one is larger than 67% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Pakri Arazi, Palasi, Araria, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance of soil mining project for Bricks of M/s CPT… — environmental approval granted, 400 m away
- soil mining project for Bricks of M/s Asha Bricks Md kayum S/O- Md Jamruddin,… — environmental approval granted, 1.7 km away
- Regarding Environmental Clearance of soil mining project for Bricks of M/s SUN… — environmental approval granted, 3.1 km away
- Mining project by M/s SUN Bricks Address Mauza-Bhima, P.O-Balua Deorhi, P.S-… — withdrawn, 3.2 km away
- Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for… — more information requested, 4.2 km away
- Mining project by M/s G K BricksAddress Mauza-DwarGaon, P.O-Bihari, P.S-… — environmental approval granted, 5.6 km away
- Diversion of 0.013725 Ha of Forest Land for Construction of Approach Road for… — lapsed, 6 km away
- Diversion of 0.0319 Ha of forest land for construction of approach road for… — more information requested, 7.7 km away
More from Pranay Kumar in Araria
- Environmental Clearance of soil mining project for Bricks of M/s CPT… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.