Quick answers
What is this project?
soil mining project for Bricks of M/s Asha Bricks Md kayum S/O- Md Jamruddin, at Khasra no-382 Khata no-134 Mauza-Balua, P.O-Balua, P.S- Palasi, Anchal- Palasi, , District- Araria (Bihar).The total mine area of proposed brick clay mining project is 4.68 Acres or 1.893 Ha is an approved mining project in Balua, Palasi, Araria, Bihar. The site covers 4.7 acres.
Who is building it?
The applicant is Md Kayum.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Jun 2026), as of 27 Nov 2026.
Where is it?
In Balua, Palasi, Araria, Bihar.
How big is it?
It has a stated cost of ₹7 lakh and a site of 4.7 acres.
When was it filed?
The application was filed on 19 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Jun 2026 |
| Application filed | 19 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Md Kayum |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Balua |
| Taluk / tehsil | Palasi |
| District | Araria |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02218 |
In context
46 applications in Araria since January 2022 are in the same category (Mining): 38 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 4.7 acres, this one is larger than 74% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Balua, Palasi, Araria, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s CPT BricksAddress Mauza-Pakri, P.O-Balua Deorhi, P.S-… — withdrawn, 1.7 km away
- Environmental Clearance of soil mining project for Bricks of M/s CPT… — environmental approval granted, 2 km away
- Regarding Environmental Clearance of soil mining project for Bricks of M/s SUN… — environmental approval granted, 2.1 km away
- Mining project by M/s SUN Bricks Address Mauza-Bhima, P.O-Balua Deorhi, P.S-… — withdrawn, 2.3 km away
- Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for… — more information requested, 3.8 km away
- Diversion of 0.0319 Ha of forest land for construction of approach road for… — more information requested, 6 km away
- Diversion of 0.0285 Ha of Forest Land for Construction of Approach Road for… — more information requested, 7.1 km away
- Mining project by M/s G K BricksAddress Mauza-DwarGaon, P.O-Bihari, P.S-… — environmental approval granted, 7.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.