Project details
| Official title | Brick Earth Mining for M/S Dhiraj Ent Udyog- Paramdihari Soil Brick Mining Project at Village/Mauza- Paramdihari, P.O- Rupsagar, P.S- Surajpura, District- Buxar (Bihar) |
|---|---|
| Status | Environmental approval granted |
| Status since | 12 Mar 2026 |
| Application filed | 8 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Barun Kumar Singh |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Param Dehri |
| Taluk / tehsil | Nawanagar |
| District | Buxar |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01378 |
In context
48 applications in Buxar since January 2022 are in the same category (Mining): 37 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 4.4 acres, this one is smaller than 60% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Param Dehri, Nawanagar, Buxar, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gunjadihri Soil Brick Mine — environmental approval granted, 1.4 km away
- Proposed Brick Earth Mining for M/S Muskan Ett Udyog – Bhatauli Soil Brick… — environmental approval granted, 4.4 km away
- Brick Earth Mining for M/S Hira Eat Udyog- Turaopatti Soil Brick Mining… — environmental approval granted, 4.5 km away
- Proposed Brick Earth Mining for M/S Bharat Int Udyog - Bhatauli Soil Brick… — under environmental review, 4.6 km away
- Greenfield Project of 150 Grain Based Distillery Plant by M/s Swadeshi Fuels LLP — environmental approval granted, 7.5 km away
- Proposed 'Nawanagar Industrial Area', located at Nawanagar Block, Buxar… — under environmental review, 7.8 km away
- Proposed 'Nawanagar Industrial Area', located at Nawanagar Block, Buxar… — cleared for impact study, 7.8 km away
- Proposed Brick Earth Mining for M/S NEW VIP Int Udyog- Bhadar Soil Brick… — environmental approval granted, 9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.