One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 'Nawanagar Industrial Area', located at Nawanagar Block, Buxar District, Bihar,…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Oct 2026 |
| Application filed | 21 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Bihar Industrial Area Development Authority |
| Land area | 404.7 acres (163.8 ha) |
| Project cost | ₹261.4 crore |
| Village / locality | Nawanagar |
| Taluk / tehsil | Nawanagar |
| District | Buxar |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01523 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Jul 2026 (this page) | Under environmental review | 404.7 acres | ₹261.4 crore |
| Early planning filed 23 Sept 2024 | Cleared for impact study | 404.7 acres | ₹261.4 crore |
In context
5 applications in Buxar since January 2022 are in the same category (Industry): 4 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nawanagar, Buxar, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 'Nawanagar Industrial Area', located at Nawanagar Block, Buxar… — cleared for impact study, 0 m away
- Greenfield Project of 150 Grain Based Distillery Plant by M/s Swadeshi Fuels LLP — environmental approval granted, 350 m away
- Proposed Brick Earth Mining for M/S NEW VIP Int Udyog- Bhadar Soil Brick… — environmental approval granted, 2.6 km away
- Proposed Brick Earth Mining for M/S VIP Int Udyog- Bhadar Soil Brick Mining… — environmental approval granted, 3.5 km away
- Proposed Brick Earth Mining for M/S Bharat Int Udyog - Bhatauli Soil Brick… — under environmental review, 3.5 km away
- Brick Earth Mining for M/S Vivek Int Udyog- Usarwalia Soil Brick Mining… — environmental approval granted, 4.3 km away
- Brick Earth Mining for M/S Hira Eat Udyog- Turaopatti Soil Brick Mining… — environmental approval granted, 4.5 km away
- Proposed Brick Earth Mining for M/S Muskan Ett Udyog – Bhatauli Soil Brick… — environmental approval granted, 4.5 km away
All 15 Bihar Industrial Area Development Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.