Sand Mining Project at Aurangabad Son 15-A Sand Ghat at Mauja– Navner (Dihra) Anchal + P.O+P.S - Obra, District- Aurangabad (Bihar) Area-30.0 Ha

Sand Mining Project at Aurangabad Son 15-A Sand Ghat at Mauja– Navner (Dihra) Anchal + P.O+P.S - Obra, District- Aurangabad (Bihar) Area-30.0 Ha is a withdrawn mining project in Kadirpura, Barun, Aurangabad, Bihar. The site covers 74.1 acres. Its stated project cost is ₹9.1 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 26 Dec 2025).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Mining Project at Aurangabad Son 15-A Sand Ghat at Mauja– Navner (Dihra) Anchal + P.O+P.S - Obra, District- Aurangabad (Bihar) Area-30.0 Ha is a withdrawn mining project in Kadirpura, Barun, Aurangabad, Bihar. The site covers 74.1 acres.

Who is building it?

The applicant is Pintu Kumar.

Has it been approved?

No. The application was withdrawn on 26 Dec 2025, so it is no longer under consideration.

Where is it?

In Kadirpura, Barun, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹9.1 crore and a site of 74.1 acres.

When was it filed?

The application was filed on 26 Dec 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project at Aurangabad Son 15-A Sand Ghat at Mauja– Navner (Dihra) Anchal +…

Project details

StatusWithdrawn
Status since26 Dec 2025
Application filed26 Dec 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantPintu Kumar
Land area74.1 acres (30 ha)
Project cost₹9.1 crore
Village / localityKadirpura
Taluk / tehsilBarun
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-01415

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 2 Apr 2026Under environmental review74.1 acres₹9.1 crore
Early planning filed 26 Dec 2025 (this page)Withdrawn74.1 acres₹9.1 crore

In context

145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 74.1 acres, this one is larger than 54% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 381.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 27 mining leases have applied within 5 km.

Where it is

Kadirpura, Barun, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.