Quick answers
What is this project?
Proposed Sand Mining Project Aurangabad Sone- 15-B on Sone River of District- Aurangabad, State- Bihar is a proposed mining project in Kadirpura, Barun, Aurangabad, Bihar. The site covers 86.5 acres.
Who is building it?
The applicant is Alok Kumar Shoundik.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kadirpura, Barun, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹10.8 crore and a site of 86.5 acres.
When was it filed?
The application was filed on 12 Nov 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project Aurangabad Sone- 15-B on Sone River of District-…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 12 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Alok Kumar Shoundik |
| Land area | 86.5 acres (35 ha) |
| Project cost | ₹10.8 crore |
| Village / locality | Kadirpura |
| Taluk / tehsil | Barun |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01311 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Nov 2026 | Under environmental review | 86.5 acres | ₹10.8 crore |
| Early planning filed 12 Nov 2025 (this page) | Under environmental review | 86.5 acres | ₹10.8 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 86.5 acres, this one is larger than 81% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 460.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 28 mining leases have applied within 5 km.
Where it is
Kadirpura, Barun, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project Aurangabad Sone- 15-B on Sone River of District-… — under environmental review, 0 m away
- Sand Mining Project at Aurangabad Son 15-A Sand Ghat at Mauja– Navner (Dihra)… — under environmental review, 250 m away
- Sand Mining Project at Aurangabad Son 15-A Sand Ghat at Mauja– Navner (Dihra)… — withdrawn, 250 m away
- Sand Mining Project at Aurangabad Son 11-C Sand Ghat at Mauja– Navner (Dihra)… — withdrawn, 250 m away
- Proposed Sand Mining Project of Area 32.40 Ha at Aurangabad Sone- 15C Sand… — under environmental review, 250 m away
- Proposed Sand Mining Project of Area 32.40 Ha at Aurangabad Sone- 15C Sand… — cleared for impact study, 250 m away
- Proposed Sand Mining Project Aurangabad Sone-14-C on Sone River of District-… — environmental approval granted, 450 m away
- Proposed Sand Mining Project Aurangabad Sone-14-C on Sone River of District-… — cleared for impact study, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.