Quick answers
What is Vishnu Sugar Mills Ltd. (Molasse based Distillery Project)?
Vishnu Sugar Mills Ltd. (Molasse based Distillery Project) is a rejected industrial project in Harkhua, Gopalganj, Bihar. The site covers 9.5 acres.
Who is building it?
The applicant is Vishnu Sugar Mills Limited.
Has it been approved?
No. The application was rejected on 11 Mar 2026.
Where is it?
In Harkhua, Gopalganj, Bihar.
How big is it?
It has a stated cost of ₹96 crore and a site of 9.5 acres.
When was it filed?
The application was filed on 4 Jan 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Vishnu Sugar Mills Ltd. (Molasse based Distillery Project)
Project details
| Status | Not approved |
|---|---|
| Status since | 11 Mar 2026 |
| Application filed | 4 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Vishnu Sugar Mills Limited |
| Land area | 9.5 acres (3.8 ha) |
| Project cost | ₹96 crore |
| Village / locality | Harkhua |
| Taluk / tehsil | Gopalganj |
| District | Gopalganj |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01463 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 4 Jan 2026 (this page) | Not approved | 9.5 acres | ₹96 crore |
| New project filed 23 Jul 2023 | Environmental approval granted | 9.5 acres | ₹90 crore |
In context
5 applications in Gopalganj since January 2022 are in the same category (Industry): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Harkhua, Gopalganj, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vishnu Sugar Mills Ltd. (Molasse based Distillery Project) — environmental approval granted, 0 m away
- Forest Clearance for Construction of 2 Lane With Paved Shoulder for Gopalganj… — more information requested, 3.1 km away
- Construction with maintenance of internal roads at Thawa Temple precinct… — lapsed, 5.1 km away
- Thawe Eco Park — lapsed, 5.2 km away
- Proposed Brick Earth Mining for M/S BHARAT EIT UDYOG - Bangra Soil Brick… — environmental approval granted, 6.8 km away
- Sand Mining Project, Jagiri Tola - K Sand Ghat on Gandak River, Village-Jagiri… — environmental approval granted, 7.1 km away
- Sand Mining Project, Jagiri Tola - K Sand Ghat on Gandak River, Village-Jagiri… — cleared for impact study, 7.1 km away
- Diversion of 0.02325 Ha of Forest Land for Construction of Approach Road for… — lapsed, 7.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.