Quick answers
What is this project?
Proposed Brick Earth Mining for M/S BHARAT EIT UDYOG - Bangra Soil Brick Mining Project at Mauza+Village-Bangra, P.O+P.S-Manjhagarh, District- Gopalganj (Bihar) is an approved mining project in Harpur, Thawe, Gopalganj, Bihar. The site covers 2.7 acres.
Who is building it?
The applicant is Kaushari Khatoon.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Sept 2026), as of 27 Nov 2026.
Where is it?
In Harpur, Thawe, Gopalganj, Bihar.
How big is it?
It has a stated cost of ₹5 lakh and a site of 2.7 acres.
When was it filed?
The application was filed on 12 Aug 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Sept 2026 |
| Application filed | 12 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kaushari Khatoon |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Harpur |
| Taluk / tehsil | Thawe |
| District | Gopalganj |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01526 |
In context
23 applications in Gopalganj since January 2022 are in the same category (Mining): 19 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 2.7 acres, this one is smaller than 91% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Harpur, Thawe, Gopalganj, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thawe Eco Park — lapsed, 5.4 km away
- Construction with maintenance of internal roads at Thawa Temple precinct… — lapsed, 5.4 km away
- Diversion of 0.02325 Ha of Forest Land for Construction of Approach Road for… — lapsed, 5.5 km away
- Forest Clearance for Construction of 2 Lane With Paved Shoulder for Gopalganj… — more information requested, 5.6 km away
- Vishnu Sugar Mills Ltd. (Molasse based Distillery Project) — not approved, 6.8 km away
- Vishnu Sugar Mills Ltd. (Molasse based Distillery Project) — environmental approval granted, 6.8 km away
- Proposed Brick Earth Mining Project for M/S 2X Int Udyog at Vill/mauza:… — initial checks, 8.1 km away
- Kisan Biofuel Retail outlet dealership of M/S NX100 Pacific Biofuel Pvt. Ltd… — more information requested, 9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.