Project details
| Official title | Proposed Brick Earth Mining for M/S VIP Int Udyog- Bhadar Soil Brick Mining Project at Village - Bhadar ,P.O-Bhadar, P.S-Sikrauli Lakh, District-Buxar (Bihar) |
|---|---|
| Status | Environmental approval granted |
| Status since | 28 Feb 2026 |
| Application filed | 7 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajendra Singh Yadav |
| Land area | 5.3 acres (2.1 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Bhadar G.P |
| Taluk / tehsil | Nawanagar |
| District | Buxar |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02454 |
In context
48 applications in Buxar since January 2022 are in the same category (Mining): 37 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 5.3 acres, this one is larger than 68% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Bhadar G.P, Nawanagar, Buxar, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining for M/S NEW VIP Int Udyog- Bhadar Soil Brick… — environmental approval granted, 1 km away
- Proposed 'Nawanagar Industrial Area', located at Nawanagar Block, Buxar… — under environmental review, 3.5 km away
- Proposed 'Nawanagar Industrial Area', located at Nawanagar Block, Buxar… — cleared for impact study, 3.5 km away
- Greenfield Project of 150 Grain Based Distillery Plant by M/s Swadeshi Fuels LLP — environmental approval granted, 3.8 km away
- Brick Earth Mining for M/S Vivek Int Udyog- Usarwalia Soil Brick Mining… — environmental approval granted, 5.1 km away
- PROPOSED ORDINARY SOIL MINING PROJECT LOCATED AT MAUZA – USARVALIYA , P.O.-… — initial checks, 5.2 km away
- Proposed Brick Earth Mining for M/S Bharat Int Udyog - Bhatauli Soil Brick… — under environmental review, 6.5 km away
- Soil mining project for Brick Earth M/S MAHAL INT UDYOG of District- Buxar,… — environmental approval granted, 7.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.