Quick answers
What is this project?
Brick Earth Mining for M/S Shankar Int Udyog - Madanpur Vishwanath Soil Brick Mining Project at Mauza Madanpur Vishwanath, Village+P.O- Madanpur Vishwanath, P.S- Parsauni, District- Sitamarhi (Bihar) is an approved mining project in Na, Parsauni, Sitamarhi, Bihar. The site covers 3.4 acres.
Who is building it?
The applicant is Ramashankar Prasad Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Jul 2026), as of 27 Nov 2026.
Where is it?
In Na, Parsauni, Sitamarhi, Bihar.
How big is it?
It has a stated cost of ₹5 lakh and a site of 3.4 acres.
When was it filed?
The application was filed on 6 Jun 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Jul 2026 |
| Application filed | 6 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ramashankar Prasad Singh |
| Land area | 3.4 acres (1.4 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Na |
| Taluk / tehsil | Parsauni |
| District | Sitamarhi |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01552 |
In context
53 applications in Sitamarhi since January 2022 are in the same category (Mining): 38 approved, 12 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 3.4 acres, this one is smaller than 74% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Na, Parsauni, Sitamarhi, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining for M/S MAA BHAWANI Int Udyog - Madanpur… — environmental approval granted, 650 m away
- Brick Earth Mining Project of M/s Maa Durga Int Udyog — environmental approval granted, 3.3 km away
- Proposed Brick Earth Mining Project for M/S Bol Bum Int Udyog — environmental approval granted, 6.2 km away
- Greenfield, Gorakhpur Siliguri High Speed Access Controlled Highway starting… — more information requested, 6.6 km away
- Widening and Upgradation of existing Two Lane with Paved Shoulder Carriageway… — lapsed, 7.2 km away
- Widening and Upgradation of existing Two Lane with Paved Shoulder Carriageway… — under forest review, 7.2 km away
- Brick Earth Mining for M/S GS Eent Udyog - Rampur Parori Soil Brick Mining… — environmental approval granted, 8 km away
- Proposed Brick Earth Mining Project for M/S Jay Hanuman Int Udyog — under environmental review, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.