Quick answers
What is this project?
Proposed Brick Earth Mining Project for M/S Jay Hanuman Int Udyog is a proposed mining project in Belsand, Sitamarhi, Bihar. The site covers 4.2 acres.
Who is building it?
The applicant is Sanjiv Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Belsand, Sitamarhi, Bihar.
How big is it?
It has a stated cost of ₹40 lakh and a site of 4.2 acres.
When was it filed?
The application was filed on 17 Sept 2026.
Project details
| Official title | Proposed Brick Earth Mining Project for M/S Jay Hanuman Int Udyog at Village/Mauza- Belsand, Post- Belsand, P.S- Belsand, District-Sitamarhi, State-Bihar- 843316 |
|---|---|
| Status | Under environmental review |
| Status since | 9 Nov 2026 |
| Application filed | 17 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sanjiv Kumar |
| Land area | 4.2 acres (1.7 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Belsand |
| Taluk / tehsil | Belsand |
| District | Sitamarhi |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01569 |
In context
53 applications in Sitamarhi since January 2022 are in the same category (Mining): 38 approved, 12 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 4.2 acres, this one is larger than 58% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Belsand, Sitamarhi, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining Project for M/S Bol Bum Int Udyog — environmental approval granted, 2.9 km away
- Sand Mining Project Unit - 03 (Panrahi Sand Ghat) on Bagmati River at Mouza -… — environmental approval granted, 4.1 km away
- Sand Mining Project Unit - 03 (Panrahi Sand Ghat) on Bagmati River at Mouza -… — cleared for impact study, 4.1 km away
- Brick Earth Mining Project of M/s Uma Int Udyog — environmental approval granted, 6.6 km away
- Brick Earth Mining for M/S Shankar Int Udyog - Madanpur Vishwanath Soil Brick… — environmental approval granted, 8.3 km away
- Proposed Brick Earth Mining for M/S MAA BHAWANI Int Udyog - Madanpur… — environmental approval granted, 8.9 km away
- Brick Earth Mining Project of M/s Maa Durga Int Udyog — environmental approval granted, 9.7 km away
- Greenfield, Gorakhpur Siliguri High Speed Access Controlled Highway starting… — more information requested, 9.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.