LapsedMining · Gopalganj, Bihar

Proposed Brick Earth Mining Project of M/S Don Ett Udhyog at Mauza- Surwal, P.O + P.S + Anchal - Barauli, District - Gopalganj, State - Bihar (Area - 1.238 Ha)

Proposed Brick Earth Mining Project of M/S Don Ett Udhyog at Mauza- Surwal, P.O + P.S + Anchal - Barauli, District - Gopalganj, State - Bihar (Area - 1.238 Ha) is a lapsed mining project in Surwal, Barauli, Gopalganj, Bihar. The site covers 3.1 acres. Its stated project cost is ₹9 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 22 Nov 2026).

See it on the live map All projects in Gopalganj

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Brick Earth Mining Project of M/S Don Ett Udhyog at Mauza- Surwal, P.O + P.S + Anchal - Barauli, District - Gopalganj, State - Bihar (Area - 1.238 Ha) is a lapsed mining project in Surwal, Barauli, Gopalganj, Bihar. The site covers 3.1 acres.

Who is building it?

The applicant is Zulfakar Ali Bhuto.

Has it been approved?

No. The application was lapsed on 22 Nov 2026, so it is no longer under consideration.

Where is it?

In Surwal, Barauli, Gopalganj, Bihar.

How big is it?

It has a stated cost of ₹9 lakh and a site of 3.1 acres.

When was it filed?

The application was filed on 16 Oct 2026.

Project details

StatusLapsed
Status since22 Nov 2026
Application filed16 Oct 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantZulfakar Ali Bhuto
Land area3.1 acres (1.2 ha)
Project cost₹9 lakh
Village / localitySurwal
Taluk / tehsilBarauli
DistrictGopalganj
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-01651

In context

23 applications in Gopalganj since January 2022 are in the same category (Mining): 19 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 3.1 acres, this one is smaller than 83% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 13.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.

Where it is

Surwal, Barauli, Gopalganj, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.