Brick Earth Mining for M/S VIP Int Udyog - Bakhraur Gangwa Soil Brick Mining Project is an approved mining project in Bakhraur Tola Birl, Sidhwalia, Gopalganj, Bihar. The site covers 4 acres.
Who is building it?
The applicant is Noor Alam.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Oct 2026), as of 27 Nov 2026.
Where is it?
In Bakhraur Tola Birl, Sidhwalia, Gopalganj, Bihar.
How big is it?
It has a stated cost of ₹5 lakh and a site of 4 acres.
When was it filed?
The application was filed on 15 Sept 2026.
Project details
| Official title | Brick Earth Mining for M/S VIP Int Udyog - Bakhraur Gangwa Soil Brick Mining Project at Village-Bakhraur Gangwa, P.O+P.S-Sidhwaliya, District-Gopalganj (Bihar) |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 Oct 2026 |
| Application filed | 15 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Noor Alam |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Bakhraur Tola Birl |
| Taluk / tehsil | Sidhwalia |
| District | Gopalganj |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01852 |
In context
23 applications in Gopalganj since January 2022 are in the same category (Mining): 19 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 4 acres, this one is smaller than 57% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bakhraur Tola Birl, Sidhwalia, Gopalganj, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Conversion of the existing molasses based 100 Kld distillery to dual feed… — initial checks, 1.6 km away
- Retail out-lets dealership of M/S Hindustan Petroleum Corporation Ltd. Located… — forest land use approved, 5.3 km away
- Diversion of 0.01575 Ha of Forest Land for Construction of Approach Road for… — more information requested, 5.4 km away
- Diversion of 0.01515 Ha of Forest Land for Construction of Approach Road for… — lapsed, 8.3 km away
- Proposed Brick Earth Mining Project of M/s City Ett Udhyog at Mauza - Surwal,… — environmental approval granted, 9.3 km away
- Proposed Brick Earth Mining Project of M/S Don Ett Udhyog at Mauza- Surwal,… — lapsed, 9.3 km away
- Diversion of 0.01425 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 9.3 km away
- Forest Clearance for widening & strengthening of Barauli Surwal More to Nautan… — more information requested, 9.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.