What is Developing? Open the mapMap

Under environmental reviewMining · Samastipur, Bihar

Proposed Brick Earth Mining Project for M/S Hira Bricks Udyog at Mauza+P.O- Rahiyar Konchi, P.S+Block- Shivaji Nagar, District-Samastipur, State- Bihar.

Proposed Brick Earth Mining Project for M/S Hira Bricks Udyog at Mauza+P.O- Rahiyar Konchi, P.S+Block- Shivaji Nagar, District-Samastipur, State- Bihar is a proposed mining project in Rahiar Kunoht, Shivaji Nagar, Samastipur, Bihar. The site covers 9.9 acres. Its stated project cost is ₹44 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 20 Nov 2026).

See it on the live map All projects in Samastipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusUnder environmental review
Status since20 Nov 2026
Application filed13 Oct 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantKumari Heera Sinha
Land area9.9 acres (4 ha)
Project cost₹44 lakh
Village / localityRahiar Kunoht
Taluk / tehsilShivaji Nagar
DistrictSamastipur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-01862

In context

59 applications in Samastipur since January 2022 are in the same category (Mining): 46 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 34 days from filing to approval. At 9.9 acres, this one is larger than 85% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Rahiar Kunoht, Shivaji Nagar, Samastipur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.