Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 28 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Chhatneshwar Prasad Roy |
| Land area | 4.3 acres (1.7 ha) |
| Project cost | ₹34 lakh |
| Village / locality | Bhiraha |
| Taluk / tehsil | Rosera |
| District | Samastipur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02566 |
In context
59 applications in Samastipur since January 2022 are in the same category (Mining): 46 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 34 days from filing to approval. At 4.3 acres, this one is smaller than 54% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Bhiraha, Rosera, Samastipur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining Project for M/S Mahesh Bricks at Mauza + P.O-… — under environmental review, 1.7 km away
- Proposed Brick Earth Mining Project for M/S Durga Bricks Industries at Mauza –… — initial checks, 4.5 km away
- Proposed Brick Earth Mining Project for M/S Rahul Int Udyog at Mauza- Khaira,… — environmental approval granted, 5.3 km away
- Diversion of 0.024 ha of forest land for construction of approach road for… — forest land use approved, 6.3 km away
- Cng/Png Underground Pipeline Project Bihar 01 — more information requested, 6.7 km away
- Cgd Project Ga 01 Darbhanga,madhubani,shupal, — more information requested, 6.9 km away
- Diversion of 0.01275 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 7.1 km away
- Proposed Brick Earth Mining Project for M/S Hira Bricks Udyog at Mauza+P.O-… — under environmental review, 7.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.