Quick answers
What is this project?
Sand Mining Project Unit - 03 (Panrahi Sand Ghat) on Bagmati River at Mouza - Kansar, Block - Belsand, District - Sitamarhi, Bihar is an approved mining project in Kensar, Belsand, Sitamarhi, Bihar. The site covers 42 acres.
Who is building it?
The applicant is Sunita Devi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Feb 2026), as of 27 Nov 2026.
Where is it?
In Kensar, Belsand, Sitamarhi, Bihar.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 42 acres.
When was it filed?
The application was filed on 12 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Feb 2026 |
| Application filed | 12 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sunita Devi |
| Land area | 42 acres (17 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Kensar |
| Taluk / tehsil | Belsand |
| District | Sitamarhi |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01999 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Jan 2026 (this page) | Environmental approval granted | 42 acres | ₹1.5 crore |
| Early planning filed 3 Jun 2025 | Cleared for impact study | 42 acres | ₹1.5 crore |
In context
53 applications in Sitamarhi since January 2022 are in the same category (Mining): 38 approved, 12 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 42 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kensar, Belsand, Sitamarhi, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project Unit - 03 (Panrahi Sand Ghat) on Bagmati River at Mouza -… — cleared for impact study, 0 m away
- Proposed Brick Earth Mining Project for M/S Jay Hanuman Int Udyog — under environmental review, 4.1 km away
- Proposed Brick Earth Mining Project for M/S Bol Bum Int Udyog — environmental approval granted, 7 km away
- Brick Earth Mining Project of M/s Uma Int Udyog — environmental approval granted, 7.1 km away
- Proposed brick earth mining project located at Mauza – Manpur Ratnawali,… — environmental approval granted, 10.8 km away
- Brick Earth Mining Project of M/s Sahara Int Udyog — initial checks, 11.2 km away
- Brick Earth Mining project of M/s. Mahamaya Int Udyog. — environmental approval granted, 11.7 km away
- Brick Earth Mining Project of M/s Shree Ram Int Udyog — environmental approval granted, 12 km away
More from Sunita Devi in Sitamarhi
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.