Quick answers
What is this project?
Proposed Brick Earth Mining for M/S Puja Int Udyog- Eraura Soil Brick Mining Project is an approved mining project in Banua, Deo, Aurangabad, Bihar. The site covers 5.4 acres.
Who is building it?
The applicant is Purushotam Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 May 2026), as of 27 Nov 2026.
Where is it?
In Banua, Deo, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹6 lakh and a site of 5.4 acres.
When was it filed?
The application was filed on 31 Mar 2026.
Project details
| Official title | Proposed Brick Earth Mining for M/S Puja Int Udyog- Eraura Soil Brick Mining Project at Village- Eraura ,P.O- Eraura, P.S-Deo, District- Aurangabad (Bihar) |
|---|---|
| Status | Environmental approval granted |
| Status since | 19 May 2026 |
| Application filed | 31 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Purushotam Singh |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Banua |
| Taluk / tehsil | Deo |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02144 |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 5.4 acres, this one is smaller than 84% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Banua, Deo, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining for M/S BABA INT UDYOG - Kantari Soil Brick Mining… — environmental approval granted, 5.2 km away
- Proposed Brick Earth Mining for M/S BELA INT UDYOG - Deo Soil Brick Mining… — environmental approval granted, 7.6 km away
- Brick Earth Mining for M/S Gold Int Udyog- Pathra Soil Brick Mining Project — environmental approval granted, 8 km away
- 4/6-lane access controlled Greenfield Expressway from Varanasi to Kolkata… — in-principle approval, conditions pending, 9.4 km away
- T02 Aurangabad to Bishunpur Package No. BR-02R-748 Length 8.00 KM — initial checks, 10.9 km away
- T02 Aurangabad to Bishunpur Package No. BR-02R-748 Length 8.00 KM — lapsed, 10.9 km away
- Block -2 Sandhail Stone Mine by "Bihar State Mining Corporation Limited" — under environmental review, 12.2 km away
- Block -1 Sandhail Stone Mine by "Bihar State Mining Corporation Limited" — under environmental review, 12.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.