Quick answers
What is this project?
Brick Earth Mining for M/S Gold Int Udyog- Pathra Soil Brick Mining Project is an approved mining project in Karaman, Deo, Aurangabad, Bihar. The site covers 10.3 acres.
Who is building it?
The applicant is Murari Prasad.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Apr 2026), as of 27 Nov 2026.
Where is it?
In Karaman, Deo, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹9 lakh and a site of 10.3 acres.
When was it filed?
The application was filed on 30 Mar 2026.
Project details
| Official title | Brick Earth Mining for M/S Gold Int Udyog- Pathra Soil Brick Mining Project at Village- Pathra, P.O- Baluganj, P.S- Dhibra, District- Aurangabad (Bihar) |
|---|---|
| Status | Environmental approval granted |
| Status since | 23 Apr 2026 |
| Application filed | 30 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Murari Prasad |
| Land area | 10.3 acres (4.2 ha) |
| Project cost | ₹9 lakh |
| Village / locality | Karaman |
| Taluk / tehsil | Deo |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02439 |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 10.3 acres, this one is smaller than 82% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Karaman, Deo, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- T02 Aurangabad to Bishunpur Package No. BR-02R-748 Length 8.00 KM — initial checks, 3 km away
- T02 Aurangabad to Bishunpur Package No. BR-02R-748 Length 8.00 KM — lapsed, 3 km away
- Proposed Brick Earth Mining for M/S BABA INT UDYOG - Kantari Soil Brick Mining… — environmental approval granted, 7.2 km away
- Proposed Brick Earth Mining for M/S Puja Int Udyog- Eraura Soil Brick Mining… — environmental approval granted, 8 km away
- 4/6-lane access controlled Greenfield Expressway from Varanasi to Kolkata… — in-principle approval, conditions pending, 9.2 km away
- City Gas Distribution Project in Chatra & Palamu GA — more information requested, 13.6 km away
- Brick Earth Mining for M/S Pratap Int Udyog - Labhari Khurd Soil Brick Mining… — environmental approval granted, 13.9 km away
- Brick Earth Mining for M/S Fix Marka Int Udyog - Neura,Parsawan Soil Brick… — under environmental review, 14 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.