Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Aug 2026 |
| Application filed | 15 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Chandra Prakash Singh |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Awnkhara |
| Taluk / tehsil | Chainpur |
| District | Kaimur (Bhabua) |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02179 |
In context
29 applications in Kaimur (Bhabua) since January 2022 are in the same category (Mining): 21 approved, 8 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 3.7 acres, this one is smaller than 62% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Awnkhara, Chainpur, Kaimur (Bhabua), Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 979.76 Acres Chart Land in Diversion of forest land (31.295 Acres SONE HIGH… — more information requested, 2.1 km away
- Proposed Brick Earth Mining Project for M/S Pragya Int Udyog — under environmental review, 2.7 km away
- Proposed Brick Earth Mining Project for M/S Hata Bricks Udyog — environmental approval granted, 3 km away
- Proposed Brick Earth Mining Project for M/S Maa Int Udyog — environmental approval granted, 3.1 km away
- Proposed Brick Earth Mining Project for M/S Tata Bricks — initial checks, 4.7 km away
- 4/6-lane access controlled Greenfield Expressway from Varanasi to Kolkata… — forest land use approved, 5.1 km away
- Proposed Brick Earth Mining Project for M/S Zee Int Udyog — environmental approval granted, 6.2 km away
- Proposed Brick Earth Mining for M/S R.K.S MARKA INT UDYOG - Karzawan Soil… — initial checks, 6.3 km away
More from Chandra Prakash Singh in Kaimur (Bhabua)
- Proposed Brick Earth Mining Project for M/S Jai Maa Int Bhattha — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.