Project details
| Official title | Proposed Brick Earth Mining Project for M/S Pragya Int Udyog at Village/Mauza-Karvandiya, P.O- Hata, Thana No.176, P. S+ Anchal- Chainpur, District-Kaimur (Bhabhua), State-Bihar-821106 |
|---|---|
| Status | Under environmental review |
| Status since | 21 Nov 2026 |
| Application filed | 9 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rakesh Kumar Keshari |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹31 lakh |
| Village / locality | Karaundia |
| Taluk / tehsil | Chainpur |
| District | Kaimur (Bhabua) |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-04088 |
In context
29 applications in Kaimur (Bhabua) since January 2022 are in the same category (Mining): 21 approved, 8 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 3 acres, this one is smaller than 90% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Karaundia, Chainpur, Kaimur (Bhabua), Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining Project for M/S Hata Bricks Udyog — environmental approval granted, 1.9 km away
- Proposed Brick Earth Mining Project for M/S Tata Bricks — initial checks, 2.6 km away
- Proposed Brick Earth Mining Project for M/S Samrat Int Udyog at Mauza-… — environmental approval granted, 2.7 km away
- Proposed Brick Earth Mining Project for M/S Maa Int Udyog — environmental approval granted, 2.9 km away
- 979.76 Acres Chart Land in Diversion of forest land (31.295 Acres SONE HIGH… — more information requested, 3.8 km away
- Proposed Brick Earth Mining Project for M/S Zee Int Udyog — environmental approval granted, 4.4 km away
- Proposed Brick Earth Mining for M/S R.K.S MARKA INT UDYOG - Karzawan Soil… — initial checks, 5.6 km away
- 4/6-lane access controlled Greenfield Expressway from Varanasi to Kolkata… — forest land use approved, 7.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.