Quick answers
What is this project?
M/s R.K.M. Bricks proposed BrickEarth Mining project at Mauza- Ujhandi, Block- Jamui, Distt.- Jamui, Bihar (Mining Lease Area:- 1.43 Ha.) is an approved mining project in Ujharandi, Jamui, Bihar. The site covers 3.5 acres.
Who is building it?
The applicant is Rabindra Kumar Mandal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 May 2026), as of 27 Nov 2026.
Where is it?
In Ujharandi, Jamui, Bihar.
How big is it?
It has a stated cost of ₹8 lakh and a site of 3.5 acres.
When was it filed?
The application was filed on 18 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 May 2026 |
| Application filed | 18 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rabindra Kumar Mandal |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Ujharandi |
| Taluk / tehsil | Jamui |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02205 |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 3.5 acres, this one is smaller than 84% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Ujharandi, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project (Jamui Kiul Block No. -15) at River bed of Kiul River — environmental approval granted, 1.9 km away
- Sand Ghat Mining Project (Jamui Kiul Block No. -15) at River bed of Kiul River — cleared for impact study, 1.9 km away
- Proposed Sand Mining Project of Area 65.9 Ha at Kiul River Block -13,… — environmental approval granted, 2.6 km away
- Proposed Sand Mining Project of Area 65.9 Ha at Kiul River Block -13,… — cleared for impact study, 2.6 km away
- Proposed ANG Institute of Medical Science (AIMS), At Jamui, District- Jamui,… — initial checks, 2.8 km away
- Sand Ghat Mining Project (Jamui Kiul Block No. -14 Sand Ghat) at Kiul River bed — environmental approval granted, 2.9 km away
- Sand Ghat Mining Project (Jamui Kiul Block No. -14 Sand Ghat) at Kiul River bed — cleared for impact study, 2.9 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 12) at Riverbed of Kiul River — environmental approval granted, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.