Quick answers
What is this project?
Proposed Residential cum commercial building "Haywood Altitude" by Haywood Space Renoveter Pvt. Ltd. at Mauza- Turi Khurd, Dist.- Gaya, State- Bihar is a proposed building project in Turl Khurd, Bodh Gaya, Gaya, Bihar. The site covers 1.1 acres.
Who is building it?
The applicant is Haywood Space Renoveter Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Turl Khurd, Bodh Gaya, Gaya, Bihar.
How big is it?
It has a stated cost of ₹64.7 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 18 Aug 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 29 Sept 2026 |
| Application filed | 18 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Haywood Space Renoveter Private Limited |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹64.7 crore |
| Village / locality | Turl Khurd |
| Taluk / tehsil | Bodh Gaya |
| District | Gaya |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02331 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Aug 2026 (this page) | More information requested | 1.1 acres | ₹64.7 crore |
| Early planning filed 22 Jul 2026 | Withdrawn | 1.1 acres | ₹64.7 crore |
In context
16 applications in Gaya since January 2022 are in the same category (Buildings & townships): 11 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.1 acres, this one is smaller than 100% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Turl Khurd, Bodh Gaya, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential cum commercial building "Haywood Altitude" by Haywood… — withdrawn, 0 m away
- Laying of 8'' Dia. Steel & Mdpe Pipeline for the Development of City Gas… — lapsed, 2.1 km away
- Diversion of 0.036 ha of forest land for construction of approach road for… — forest land use approved, 2.7 km away
- Diversion of 0.02025 Ha of Forest Land for Construction of Approach Road for… — lapsed, 3.8 km away
- Sand Mining Project, Block-43 (Gaya Lilajan-01/Gaya Lilajan-02/Gaya… — environmental approval granted, 4.9 km away
- Sand Mining Project, Block-43 (Gaya Lilajan-01/Gaya Lilajan-02/Gaya… — cleared for impact study, 4.9 km away
- Sand Mining Project, Block-44 (Gaya Lilajan-04/Gaya Lilajan-05/Gaya… — environmental approval granted, 5.3 km away
- Sand Mining Project, Block-44 (Gaya Lilajan-04/Gaya Lilajan-05/Gaya… — cleared for impact study, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.