Quick answers
What is this project?
Diversion of 0.02025 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of M/S Nx100 Pacific Biofuel PVT. LTD. on NH-83 Gaya-Dobhi Road is a lapsed fuel station in Matihani, Bodh Gaya, Gaya, Bihar. The site covers 0.6 acres.
Who is building it?
The applicant is Sitaram Yadav.
Has it been approved?
No. The application was lapsed on 17 Jun 2025, so it is no longer under consideration.
Where is it?
In Matihani, Bodh Gaya, Gaya, Bihar.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.6 acres and 200 m² of forest land.
When was it filed?
The application was filed on 4 May 2023.
Project details
| Official title | Diversion of 0.02025 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of M/S Nx100 Pacific Biofuel PVT. LTD. on NH-83 Gaya-Dobhi Road in Gaya District of Bihar. |
|---|---|
| Status | Lapsed |
| Status since | 17 Jun 2025 |
| Application filed | 4 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Sitaram Yadav |
| Land area | 2,600 m² |
| Forest land | 200 m² |
| Project cost | ₹50 lakh |
| Village / locality | Matihani |
| Taluk / tehsil | Bodh Gaya |
| District | Gaya |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03738 |
In context
21 applications in Gaya since January 2022 are in the same category (Fuel stations): 5 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 0.6 acres, this one is larger than 57% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Matihani, Bodh Gaya, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.036 ha of forest land for construction of approach road for… — forest land use approved, 1.1 km away
- Diversion of 0.018 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 3.2 km away
- Proposed Residential cum commercial building "Haywood Altitude" by Haywood… — more information requested, 3.8 km away
- Proposed Residential cum commercial building "Haywood Altitude" by Haywood… — withdrawn, 3.8 km away
- Sand Mining Project, Block-44 (Gaya Lilajan-04/Gaya Lilajan-05/Gaya… — environmental approval granted, 5.4 km away
- Sand Mining Project, Block-44 (Gaya Lilajan-04/Gaya Lilajan-05/Gaya… — cleared for impact study, 5.4 km away
- Laying of 8'' Dia. Steel & Mdpe Pipeline for the Development of City Gas… — lapsed, 5.6 km away
- Proposed Brick Earth Mining for M/S Ruchi Int Udyog - Basadhi Soil Brick… — environmental approval granted, 7.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.