Project details
| Official title | Proposed Brick clay mining project at Village/Mauza- Muraha P.O- Mauji, P.S- Hasanpur, Dist- Samastipur, Bihar By M/S ABC Int Udyog |
|---|---|
| Status | Lapsed |
| Status since | 28 Oct 2026 |
| Application filed | 30 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Santosh Kumar Singhaniya |
| Land area | 2.8 acres (1.1 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Muraha |
| Taluk / tehsil | Hasanpur |
| District | Samastipur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02336 |
In context
59 applications in Samastipur since January 2022 are in the same category (Mining): 46 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 34 days from filing to approval. At 2.8 acres, this one is smaller than 93% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Muraha, Hasanpur, Samastipur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance of Greenfield Project of 100 Kld Multi Feed Based… — environmental approval granted, 4.5 km away
- Environmental Clearance of Greenfield Project of 100 Kld Multi Feed Based… — cleared for impact study, 4.5 km away
- Proposed Brick Earth Mining Project for M/S Rahul Int Udyog at Mauza- Khaira,… — environmental approval granted, 16.3 km away
- Diversion of 0.024 ha of forest land for construction of approach road for… — forest land use approved, 16.7 km away
- Proposed Brick Earth Mining Project for M/S Mahesh Bricks at Mauza + P.O-… — under environmental review, 17 km away
- Diversion of 0.01275 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 17.3 km away
- Proposed Brick Earth Mining Project for M/S Maa Durga Bricks at Mauza + P.O-… — environmental approval granted, 18.7 km away
- Proposed Brick Earth Mining Project for M/S Maa Vaishnavi Bricks Works at… — environmental approval granted, 22.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.