Quick answers
What is this project?
Proposed Sand Mining Project of Area 5.30 Ha at Sand Block Sattar Balu Ghat-01 on Gandak River of District- East Champaran(Motihari) of State-Bihar is a proposed mining project in Sundarpur, Kesaria, Purba Champaran, Bihar. The site covers 13.1 acres.
Who is building it?
The applicant is Raj Sagar.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Sundarpur, Kesaria, Purba Champaran, Bihar.
How big is it?
It has a stated cost of ₹30 lakh and a site of 13.1 acres.
When was it filed?
The application was filed on 6 Jul 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 5.30 Ha at Sand Block Sattar Balu Ghat-01 on Gandak…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 15 Oct 2026 |
| Application filed | 6 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Raj Sagar |
| Land area | 13.1 acres (5.3 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Sundarpur |
| Taluk / tehsil | Kesaria |
| District | Purba Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02562 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Oct 2026 | Environmental approval granted | 13.1 acres | ₹30 lakh |
| Early planning filed 6 Jul 2026 (this page) | Under environmental review | 13.1 acres | ₹30 lakh |
In context
45 applications in Purba Champaran since January 2022 are in the same category (Mining): 30 approved, 15 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 42 days from filing to approval. At 13.1 acres, this one is larger than 82% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 26.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Sundarpur, Kesaria, Purba Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 5.30 Ha at Sand Block Sattar Balu Ghat-01… — environmental approval granted, 0 m away
- The proposed project is Sand Mining Project on Gandak River at Sand Block… — under environmental review, 200 m away
- Grain Based Ethanol Distillery capacity 100 KLPD with 2.5 MW co-generation… — environmental approval granted, 11 km away
- Amendment in Environment Clearance (EC) of Viraat Ramayana Mandir at Mauza:… — environmental approval granted, 14.3 km away
- Brick Earth Mining Project of M/s Janta Bricks — environmental approval granted, 15.8 km away
- Proposed Brick clay mining project at Mauja- Sarotar, Block- Keshariya,… — environmental approval granted, 18.7 km away
- Sand Mining Project Dumaria Balu Ghat at Mouza- Dumaria, Block- Sangrampur,… — environmental approval granted, 19 km away
- Sand Mining Project Dumaria Balu Ghat at Mouza- Dumaria, Block- Sangrampur,… — cleared for impact study, 19 km away
More from Raj Sagar in Purba Champaran
- The proposed project is Sand Mining Project on Gandak River at Sand Block… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.