Quick answers
What is this project?
Proposed Brick Earth Mining for M/S B.K.S INT UDYOG - Bishunpura Soil Brick Mining Project at Mauza+Vill- Bishunpura, P.O-Narayanpur, P.S-Obra, District- Aurangabad (Bihar) is an approved mining project in Ratanpur, Obra, Aurangabad, Bihar. The site covers 4 acres.
Who is building it?
The applicant is Sunil Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Aug 2026), as of 27 Nov 2026.
Where is it?
In Ratanpur, Obra, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹6 lakh and a site of 4 acres.
When was it filed?
The application was filed on 15 Jul 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Aug 2026 |
| Application filed | 15 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sunil Kumar |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Ratanpur |
| Taluk / tehsil | Obra |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02854 |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 4 acres, this one is smaller than 94% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Ratanpur, Obra, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining for M/S King Int Udyog - Gira Soil Brick Mining… — environmental approval granted, 1.6 km away
- Brick Earth Mining for M/S (SBM) Subham Int Udyog - Sonahuli Soil Brick Mining… — environmental approval granted, 4.9 km away
- Brick Earth Mining for M/S Dil Int Udyog - Baur Soil Brick Mining Project — environmental approval granted, 11.8 km away
- Proposed Sand Mining Project of Area 94.88 Ha at Aurangabad Ghat 09 on Sone… — environmental approval granted, 14.2 km away
- 4 - Lane With Paved Shoulder Daudnagar Bypass From Km 93+915 to Km 102+290 of… — under forest review, 14.5 km away
- 4 - Lane With Paved Shoulder Daudnagar Bypass From Km 93+915 to Km 102+290 of… — lapsed, 14.6 km away
- 4 - Lane With Paved Shoulder Daudnagar Bypass From Km 93+915 to Km 102+290 of… — lapsed, 14.6 km away
- Sand Mining Project at Sand Block No- 14B Sand Ghat located at Mouza - Dihara,… — environmental approval granted, 14.9 km away
More from Sunil Kumar in Aurangabad
- Proposed Sand Mining Project of Area 32.40 Ha at Aurangabad Sone- 15C Sand… — under environmental review
- Proposed Sand Mining Project of Area 33.0 Ha at Aurangabad Sone-18-B Sand Ghat… — environmental approval granted
- Proposed Sand Mining Project of Area 33.0 Ha at Aurangabad Sone-18-B Sand Ghat… — cleared for impact study
- Proposed Sand Mining Project of Area 32.40 Ha at Aurangabad Sone- 15C Sand… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.