Under environmental reviewMining · Aurangabad, Bihar

Proposed Sand Mining Project of Area 32.40 Ha at Aurangabad Sone- 15C Sand Ghat on Sone River of District-Aurangabad, State-Bihar.

Proposed Sand Mining Project of Area 32.40 Ha at Aurangabad Sone- 15C Sand Ghat on Sone River of District-Aurangabad, State-Bihar is a proposed mining project in Dihra, Barun, Aurangabad, Bihar. The site covers 80.1 acres. Its stated project cost is ₹10 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 21 Nov 2026).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 32.40 Ha at Aurangabad Sone- 15C Sand Ghat on Sone River of District-Aurangabad, State-Bihar is a proposed mining project in Dihra, Barun, Aurangabad, Bihar. The site covers 80.1 acres.

Who is building it?

The applicant is Sunil Kumar.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Dihra, Barun, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹10 crore and a site of 80.1 acres.

When was it filed?

The application was filed on 23 Jun 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 32.40 Ha at Aurangabad Sone- 15C Sand Ghat on Sone…

Project details

StatusUnder environmental review
Status since21 Nov 2026
Application filed23 Jun 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSunil Kumar
Land area80.1 acres (32.4 ha)
Project cost₹10 crore
Village / localityDihra
Taluk / tehsilBarun
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-02465

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 Jun 2026 (this page)Under environmental review80.1 acres₹10 crore
Early planning filed 19 Jul 2024Cleared for impact study80.1 acres₹10 crore

In context

145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 80.1 acres, this one is larger than 71% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 393.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 28 mining leases have applied within 5 km.

Where it is

Dihra, Barun, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sunil Kumar in Aurangabad

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.