Quick answers
What is this project?
Proposed Brick Earth Mining "M/s Parwati Int Udyog" at Mauza- Jasauli, P.S- Akbarpur, Block- Akbarpur, District- Nawada, State- Bihar is an approved mining project in Jasauli, Akbarpur, Nawada, Bihar. The site covers 2.9 acres.
Who is building it?
The applicant is Md Sajjad.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Apr 2026), as of 27 Nov 2026.
Where is it?
In Jasauli, Akbarpur, Nawada, Bihar.
How big is it?
It has a stated cost of ₹36 lakh and a site of 2.9 acres.
When was it filed?
The application was filed on 19 Mar 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Apr 2026 |
| Application filed | 19 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Md Sajjad |
| Land area | 2.9 acres (1.2 ha) |
| Project cost | ₹36 lakh |
| Village / locality | Jasauli |
| Taluk / tehsil | Akbarpur |
| District | Nawada |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02909 |
In context
104 applications in Nawada since January 2022 are in the same category (Mining): 82 approved, 17 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 2.9 acres, this one is smaller than 98% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Jasauli, Akbarpur, Nawada, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S HERO EAT UDYOG - Chhatihar Soil Brick Mining Project — environmental approval granted, 3.2 km away
- Forest Clearance for Construction of (1+1) x 2 = 4 Lane Staggered Toll Plaza… — under forest review, 4.4 km away
- Brick Earth Mining for M/S Ganga Eat Udyog- Garo Bigha Soil Brick Mining… — environmental approval granted, 4.7 km away
- 200 Bedded, District Hospital at Nawada, Bihar — environmental approval granted, 5.9 km away
- Sand Mining Project of Area 13.0 Ha at Sand Block-17 Ghat on Khuri River of… — environmental approval granted, 7.1 km away
- Sand Mining Project of Area 13.0 Ha at Sand Block-17 Ghat on Khuri River of… — cleared for impact study, 7.1 km away
- ROB and its approaches at Railway Km. 70/18-20 in lieu of LC No. 33/B1 at Rly… — more information requested, 7.5 km away
- Sand Mining Project Unit-18 (Lohra Sand Ghat) on Khuri River — environmental approval granted, 8.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.