What is Developing? Open the mapMap

LapsedFuel stations · Gaya, Bihar

Diversion of 0.015 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Hpcl on NH-2 Dobhi-Barachatti Road

Diversion of 0.015 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Hpcl on NH-2 Dobhi-Barachatti Road is a lapsed fuel station in Batasi, Barachatti, Gaya, Bihar. The site covers 0.7 acres. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 22 Jan 2025).

See it on the live map All projects in Gaya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0.015 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Hpcl on NH-2 Dobhi-Barachatti Road is a lapsed fuel station in Batasi, Barachatti, Gaya, Bihar. The site covers 0.7 acres.

Who is building it?

The applicant is Rekha Kumari.

Has it been approved?

No. The application was lapsed on 22 Jan 2025, so it is no longer under consideration.

Where is it?

In Batasi, Barachatti, Gaya, Bihar.

How big is it?

It has a stated cost of ₹60 lakh; a site of 0.7 acres and 150 m² of forest land.

When was it filed?

The application was filed on 8 Dec 2022.

Project details

Official titleDiversion of 0.015 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Hpcl on NH-2 Dobhi-Barachatti Road in Gaya District of Bihar.
StatusLapsed
Status since22 Jan 2025
Application filed8 Dec 2022
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantRekha Kumari
Land area3,000 m²
Forest land150 m²
Project cost₹60 lakh
Village / localityBatasi
Taluk / tehsilBarachatti
DistrictGaya
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-03132

In context

21 applications in Gaya since January 2022 are in the same category (Fuel stations): 5 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 0.7 acres, this one is larger than 71% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Batasi, Barachatti, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.