Diversion of 0.018 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Bpcl on Mauza-Uttrain, Thana-Konch to NH-120 Gaya-Goh Road

Diversion of 0.018 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Bpcl on Mauza-Uttrain, Thana-Konch to NH-120 Gaya-Goh Road is a proposed fuel station in Utren, Konch, Gaya, Bihar. The site covers 0.9 acres. Its stated project cost is ₹80 lakh. As of 27 Nov 2026, its status is “More information requested” (since 24 Nov 2026).

See it on the live map All projects in Gaya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0.018 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Bpcl on Mauza-Uttrain, Thana-Konch to NH-120 Gaya-Goh Road is a proposed fuel station in Utren, Konch, Gaya, Bihar. The site covers 0.9 acres.

Who is building it?

The applicant is Vatsh Krishna.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Utren, Konch, Gaya, Bihar.

How big is it?

It has a stated cost of ₹80 lakh; a site of 0.9 acres and 180 m² of forest land.

When was it filed?

The application was filed on 29 May 2025.

Project details

Official titleDiversion of 0.018 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Bpcl on Mauza-Uttrain, Thana-Konch to NH-120 Gaya-Goh Road in Gaya District of Bihar.
StatusMore information requested
Status since24 Nov 2026
Application filed29 May 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantVatsh Krishna
Land area3,500 m²
Forest land180 m²
Project cost₹80 lakh
Village / localityUtren
Taluk / tehsilKonch
DistrictGaya
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-03417

In context

21 applications in Gaya since January 2022 are in the same category (Fuel stations): 5 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 0.9 acres, this one is larger than 81% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Utren, Konch, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.