Quick answers
What is this project?
Brick Earth mining project of M/s JBM Int Udyog at Vill.: Rupaspur, Anchal.: Tikari, District-Gaya, State- Bihar (Lease Area: 0.80 Ha.) is an approved mining project in Rupaspur, Tikari, Gaya, Bihar. The site covers 2 acres.
Who is building it?
The applicant is Varsha Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Mar 2026), as of 27 Nov 2026.
Where is it?
In Rupaspur, Tikari, Gaya, Bihar.
How big is it?
It has a stated cost of ₹7 lakh and a site of 2 acres.
When was it filed?
The application was filed on 21 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Mar 2026 |
| Application filed | 21 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Varsha Singh |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Rupaspur |
| Taluk / tehsil | Tikari |
| District | Gaya |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02042 |
In context
189 applications in Gaya since January 2022 are in the same category (Mining): 171 approved, 15 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2 acres, this one is smaller than 99% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Rupaspur, Tikari, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Block 40 (Gaya Budh 04/05/06/07/ 08) Sand Ghat — environmental approval granted, 1.8 km away
- Sand Mining Project, Block 40 (Gaya Budh 04/05/06/07/ 08) Sand Ghat — cleared for impact study, 1.8 km away
- Proposed Brick Earth Mining Project of M/s Sangam Bricks at Mauza - Utrain,… — environmental approval granted, 2.9 km away
- Diversion of 0.018 Ha of Forest Land for Construction of Approach Road for… — more information requested, 3.5 km away
- Proposed Sand Mining Project Sand Block No.-18 (Gaya Morhar-05) on Morhar… — environmental approval granted, 3.9 km away
- Proposed Sand Mining Project Sand Block No.-18 (Gaya Morhar-05) on Morhar… — cleared for impact study, 3.9 km away
- Diversion of 0.01275 Ha of Forest Land for Construction of Approach Road for… — lapsed, 4.9 km away
- Diversion of 0.01275 Ha of Forest Land for Construction of Approach Road for… — lapsed, 5.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.