What is 33KV New Line Under State Plan?
33KV New Line Under State Plan is a lapsed power project in Raghunathpur, Belhar, Banka, Bihar. The site covers 4.7 acres.
Who is building it?
The applicant is South Bihar Power Distribution Company Limited.
Has it been approved?
No. The application was lapsed on 17 Nov 2026, so it is no longer under consideration.
Where is it?
In Raghunathpur, Belhar, Banka, Bihar.
How big is it?
It has a stated cost of ₹25.7 crore; a site of 4.7 acres and 4.7 acres (1.9 ha) of forest land.
When was it filed?
The application was filed on 1 Feb 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 1 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | South Bihar Power Distribution Company Limited |
| Land area | 4.7 acres (1.9 ha) |
| Forest land | 4.7 acres (1.9 ha) |
| Project cost | ₹25.7 crore |
| Village / locality | Raghunathpur |
| Taluk / tehsil | Belhar |
| District | Banka |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03622 |
In context
5 applications in Banka since January 2022 are in the same category (Power): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raghunathpur, Belhar, Banka, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 33KV Lines on Overhead Wolf Conductor From Tonapathar Gss to Under Constructed… — more information requested, 1.5 km away
- Retail out-let dealership of Bio Diesel M/s Hinduja Petrolium (A Unit of GIBPP… — under forest review, 1.6 km away
- Retail out-let dealership of M/s Indian Oil Corporation Ltd. Location In… — forest land use approved, 2.6 km away
- Diversion of 1.395 ha land in Belhar block for Construction of Belhar Deoghar… — lapsed, 5.3 km away
- Banka Power Project — in-principle approval, conditions pending, 5.4 km away
- The Length of This Road Is 21.40 Km of Which 12.2 Km 15.4 Km and 17.5 Km Is… — lapsed, 6.7 km away
- Forest Clearance for Widening and Strengthening of Sultanganj-Tarapur… — lapsed, 8.7 km away
- Retail out-let dealership of M/s Indian Oil Corporation Ltd. Location Within 6… — forest land use approved, 10.3 km away
More from South Bihar Power Distribution Company Limited in Banka
- 33KV Lines on Overhead Wolf Conductor From Tonapathar Gss to Under Constructed… — more information requested
- Grid Connectivity to villages of Chanan and Belhar Block of Banka District — more information requested
3 South Bihar Power projects in Banka
All 32 South Bihar Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.