Quick answers
What is this project?
Proposed Brick Earth Mining for M/S STAR ENT UDYOG - Uchkagaon Soil Brick Mining Project at Mauza+Village-Uchkagaon, P.O.-Uchkagaon, P.S-Uchkagaon, District- Gopalganj (Bihar) is a proposed mining project in Uchkagaon, Gopalganj, Bihar. The site covers 2.2 acres.
Who is building it?
The applicant is Mohammad Harun.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Uchkagaon, Gopalganj, Bihar.
How big is it?
It has a stated cost of ₹5 lakh and a site of 2.2 acres.
When was it filed?
The application was filed on 20 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 20 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mohammad Harun |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Uchkagaon |
| Taluk / tehsil | Uchkagaon |
| District | Gopalganj |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-04178 |
In context
23 applications in Gopalganj since January 2022 are in the same category (Mining): 19 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 2.2 acres, this one is smaller than 96% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Uchkagaon, Gopalganj, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- (New Kisan Sewa Kendra Biofuel Retail out-let) Bio Diesel, Bio Fuel (E Fuel),… — initial checks, 6.1 km away
- Brick Earth Mining project of M/S Raj Int Udyog at Vill.: Dahibhata, P.O. &… — environmental approval granted, 7.4 km away
- Proposed Brick Earth Mining for M/S MK Ent Udyog - Maksudpur Soil Brick Mining… — environmental approval granted, 7.6 km away
- Proposed Brick Earth Mining Project for M/S A.B.M Bricks — environmental approval granted, 7.7 km away
- Proposed Brick Earth Mining Project for M/S 2X Int Udyog at Vill/mauza:… — initial checks, 8.3 km away
- Brick Earth Mining for M/S N.M. ITT UDYOG - Piprakhas Soil Brick Mining… — environmental approval granted, 8.3 km away
- Diversion of 0.02265 Ha of Forest Land for Construction of Approach Road for… — lapsed, 9.3 km away
- Diversion of 0.02325 Ha of Forest Land for Construction of Approach Road for… — lapsed, 10.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.