What is Developing? Open the mapMap

Environmental approval grantedIndustry · Bametara, Chhattisgarh

Greenfield Project of 120 KLPD Grain Based Ethanol Plant by M/s Varsha Biofuels Private Limited

Greenfield Project of 120 KLPD Grain Based Ethanol Plant by M/s Varsha Biofuels Private Limited is an approved industrial project in Kathiya, Berla, Bametara, Chhattisgarh. The site covers 19.8 acres. Its stated project cost is ₹160 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 3 Oct 2022).

See it on the live map All projects in Bametara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield Project of 120 KLPD Grain Based Ethanol Plant by M/s Varsha Biofuels Private Limited is an approved industrial project in Kathiya, Berla, Bametara, Chhattisgarh. The site covers 19.8 acres.

Who is building it?

The applicant is Varsha Biofuels Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 3 Oct 2022), as of 27 Nov 2026.

Where is it?

In Kathiya, Berla, Bametara, Chhattisgarh.

How big is it?

It has a stated cost of ₹160 crore and a site of 19.8 acres.

When was it filed?

The application was filed on 3 Oct 2022.

Project details

Official titleGreenfield Project of 120 KLPD Grain Based Ethanol Plant along with 3.0 MW Co-generation Power Plant located at Village- Kathiya, Tehsil- Berla, District- Bemetara, Chhattisgarh, 493992 by M/s Varsha Biofuels Private Limited.
StatusEnvironmental approval granted
Status since3 Oct 2022
Application filed3 Oct 2022
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantVarsha Biofuels Private Limited
Land area19.8 acres (8 ha)
Project cost₹160 crore
Village / localityKathiya
Taluk / tehsilBerla
DistrictBametara
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00053

In context

24 applications in Bametara since January 2022 are in the same category (Industry): 15 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19.8 acres, this one is smaller than 83% of them.

Where it is

Kathiya, Berla, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.