What is this project?
Proposed "enhancement in Ethanol (Grain based) Production Capacity from 65 KLPD to 90 KLPD & 2 MW co-generation Power Plant only without increase in the Pollution Load in the existing plant premises as per Gazette Notification dated 23rd November 2016 & 16th January, 2020 & 2nd March 2021 issued by Ministry of Environment, Forest & Climate Change is a proposed power project in Pathra, Bemetara, Bametara, Chhattisgarh. The site covers 10.4 acres.
Who is building it?
The applicant is Biotech Fuels Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Pathra, Bemetara, Bametara, Chhattisgarh.
How big is it?
It has a stated cost of ₹76.3 crore and a site of 10.4 acres.
When was it filed?
The application was filed on 19 Jun 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 19 Jun 2025 |
| Application filed | 19 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Power |
| Applicant | Biotech Fuels Private Limited |
| Land area | 10.4 acres (4.2 ha) |
| Project cost | ₹76.3 crore |
| Village / locality | Pathra |
| Taluk / tehsil | Bemetara |
| District | Bametara |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02578 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pathra, Bemetara, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Request for Amendment to Environmental Clearance (EC) issued to BIOTECH FUELS… — environmental approval granted, 0 m away
- Grain Based Distllery Palnt Capacity of 1 X 65 Klpd — environmental approval granted, 0 m away
- Dokla Bricks Earth Quarry — environmental approval granted, 1.7 km away
- Request for amendment to the Environmental Clearance (EC) issued to M/s. Risen… — environmental approval granted, 6.4 km away
- Proposed change in DRI Plant Configuration from 2 x 200 TPD & 2 x 100 TPD… — initial checks, 6.4 km away
- Greenfield Project of 120 KLPD Grain Based Ethanol Plant by M/s Varsha… — environmental approval granted, 7 km away
- Proposed 400 KLPD Grain Based Distillery — environmental approval granted, 8 km away
- Baherghat Sand Mine — lapsed, 8.5 km away
More from Biotech Fuels Private Limited in Bametara
- Request for Amendment to Environmental Clearance (EC) issued to BIOTECH FUELS… — environmental approval granted
- Grain Based Distllery Palnt Capacity of 1 X 65 Klpd — environmental approval granted
All 3 Biotech Fuels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.