Environmental approval grantedIndustry · Janjgir - Champa, Chhattisgarh

PROPOSED EXPANSION OF STEEL PLANT - Establishment of New Iron Ore Beneficiation (1.0 MTPA), New Iron Ore Pelletisation Unit (1.5 MTPA), New Coal Gasifier for Pellet Plant (5 x 8000 Nm3/hr), New Coal Washery (2 x 1.0 MTPA), New Wire Rod /TMT Mill (4 x 0.25 MTPA), New Coal Gasifier for Wire Rod / TMT Mill (5 x 8000 Nm3/hr.), Expansion FBC Based Power Plant (162.5 MW to 165 MW) & Expansion of Oxygen Plant (8.0 TPD to 16 TPD)

PROPOSED EXPANSION OF STEEL PLANT - Establishment of New Iron Ore Beneficiation (1.0 MTPA), New Iron Ore Pelletisation Unit (1.5 MTPA), New Coal Gasifier for Pellet Plant (5 x 8000 Nm3/hr), New Coal Washery (2 x 1.0 MTPA), New Wire Rod /TMT Mill (4 x 0.25 MTPA), New Coal Gasifier for Wire Rod / TMT Mill (5 x 8000 Nm3/hr.), Expansion FBC Based Power Plant (162.5 MW to 165 MW) & Expansion of Oxygen Plant (8.0 TPD to 16 TPD) is an approved industrial project in Hathnevra, Champa, Janjgir - Champa, Chhattisgarh. The site covers 602.3 acres. Its stated project cost is ₹4,804 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 8 May 2024).

See it on the live map All projects in Janjgir - Champa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since8 May 2024
Application filed7 Jan 2024
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantPrakash Industries Limited
Land area602.3 acres (243.8 ha)
Project cost₹4,804 crore
Village / localityHathnevra
Taluk / tehsilChampa
DistrictJanjgir - Champa
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00086

In context

13 applications in Janjgir - Champa since January 2022 are in the same category (Industry): 10 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 602.3 acres, this one is larger than 92% of them.

37 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hathnevra, Champa, Janjgir - Champa, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Prakash Industries Limited in Janjgir - Champa

All 6 Prakash Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.