Cleared for impact studyIndustry · Janjgir - Champa, Chhattisgarh

Expansion of Steel plant comprising of expansion of Sponge Iron plant from 1.2 MTPA to 2.2 MTPA, WHRB Power Plant from 75 MW to 165 MW, FBC Power Plant from 165 MW to 315 MW, Ingots /Billets/Blooms (IF-AOD-LRF / BF – EAF - LD Converter route) from 1.25 MTPA to 2.25 MTPA, Wire Rod / TMT Mill from 1.0 MTPA to 1.50 MTPA, Coal Gasifier for Wire Rod / TMT Mill from 5 x 8000 Nm3/Hr. to 5 x 8000 Nm3/Hr. & 3 x 10000 Nm3/Hr., expansion of Oxygen plant from 16 TPD to 24 TPD and New SAF (8 x 11 MVA) to pro

Expansion of Steel plant comprising of expansion of Sponge Iron plant from 1.2 MTPA to 2.2 MTPA, WHRB Power Plant from 75 MW to 165 MW, FBC Power Plant from 165 MW to 315 MW, Ingots /Billets/Blooms (IF-AOD-LRF / BF – EAF - LD Converter route) from 1.25 MTPA to 2.25 MTPA, Wire Rod / TMT Mill from 1.0 MTPA to 1.50 MTPA, Coal Gasifier for Wire Rod / TMT Mill from 5 x 8000 Nm3/Hr. to 5 x 8000 Nm3/Hr. & 3 x 10000 Nm3/Hr., expansion of Oxygen plant from 16 TPD to 24 TPD and New SAF (8 x 11 MVA) to pro is a proposed industrial project in Hathnevra, Champa, Janjgir - Champa, Chhattisgarh. The site covers 601.7 acres. Its stated project cost is ₹2,153 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 May 2026).

See it on the live map All projects in Janjgir - Champa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since29 May 2026
Application filed27 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantPrakash Industries Limited
Land area601.7 acres (243.5 ha)
Project cost₹2,153 crore
Village / localityHathnevra
Taluk / tehsilChampa
DistrictJanjgir - Champa
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02995

In context

13 applications in Janjgir - Champa since January 2022 are in the same category (Industry): 10 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 601.7 acres, this one is larger than 85% of them.

37 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hathnevra, Champa, Janjgir - Champa, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Prakash Industries Limited in Janjgir - Champa

All 6 Prakash Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.