Quick answers
What is this project?
Regularization of Re-Rolling Mill plant of 30,000 MTPA capacity, in compliance to the MoEF&CC Notification dated 20th July 2022 at Khasra No. - 272/5, 272/6, 272/7 & 272/8, Industrial Area Urla, Village- Sarora, Tehsil & Dist. – Raipur (C.G.) by M/s U.K. Steel is a proposed industrial project in Sarora, Raipur, Chhattisgarh. The site covers 4 acres.
Who is building it?
The applicant is U K Steel.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 Mar 2023), as of 27 Nov 2026.
Where is it?
In Sarora, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹3 crore and a site of 4 acres.
When was it filed?
The application was filed on 25 Mar 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Mar 2023 |
| Application filed | 25 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | U K Steel |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹3 crore |
| Village / locality | Sarora |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00119 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4 acres, this one is smaller than 78% of them.
78 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarora, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of Re-Rolling Mill plant of 30000 MTPA capacity, in compliance… — cleared for impact study, 250 m away
- Proposed Expansion from Induction furnace, CCM from existing 57600 TPA to… — environmental approval granted, 550 m away
- Proposed Expansion from Induction furnace, CCM from existing 57600 TPA to… — cleared for impact study, 550 m away
- Environmental Clearance for proposed Regularization cum expansion of existing… — not approved, 800 m away
- Regularization of Existing 46,000 TPA Rolling Mill — returned to applicant, 900 m away
- Regularization of Existing 46,000 TPA Rolling Mill — more information requested, 950 m away
- Regularization of Re-Rolling Mill plant of 30,000 MTPA capacity, in compliance… — cleared for impact study, 1 km away
- Ashok Ispat Udyog — cleared for impact study, 1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.