Quick answers
What is this project?
Environmental Clearance for proposed Regularization cum expansion of existing Rolling Mill 12,000 TPA to 70,244 TPA (58,244 TPA Hot charging with Hot Billets and remaining 12,000 TPA through RHF), Establishment of New Induction Furnaces (2 x 12 T) - 72,000 TPA Capacity, ERW Black Pipes, Galvanised Pipes / Tubes 1,20,000 TPA [Existing ERW Black Pipes, Galvanized Pipes / Tubes - 43,200 TPA + Proposed ERW Black Pipes – 76,800 TPA] as per Notification issued by MoEF&CC, New Delhi vide no. S.O. 3250 is a rejected industrial project in Sarora, Raipur, Chhattisgarh. The site covers 17.7 acres.
Who is building it?
The applicant is Jtl Industries Limited.
Has it been approved?
No. The application was rejected on 16 Dec 2024.
Where is it?
In Sarora, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹33.2 crore and a site of 17.7 acres.
When was it filed?
The application was filed on 17 Jan 2024.
Project details
| Status | Not approved |
|---|---|
| Status since | 16 Dec 2024 |
| Application filed | 17 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jtl Industries Limited |
| Land area | 17.7 acres (7.2 ha) |
| Project cost | ₹33.2 crore |
| Village / locality | Sarora |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01770 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 17.7 acres, this one is smaller than 56% of them.
79 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarora, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of the existing manufacturing of Re-Rolled Products having… — more information requested, 750 m away
- Regularization of Re-Rolling Mill plant of 30,000 MTPA capacity, in compliance… — cleared for impact study, 800 m away
- Proposed Expansion from Induction furnace, CCM from existing 57600 TPA to… — environmental approval granted, 950 m away
- Proposed Expansion from Induction furnace, CCM from existing 57600 TPA to… — cleared for impact study, 950 m away
- Regularization of the existing manufacturing of Re-Rolled Products having… — cleared for impact study, 950 m away
- Industrial project by Shri Giriraj Loha Private Limited — cleared for impact study, 1000 m away
- Regularization of Re-Rolling Mill plant of 30000 MTPA capacity, in compliance… — cleared for impact study, 1000 m away
- Regularization of the existing project of Re Rolled Product Through Induction… — more information requested, 1 km away
All 4 Jtl Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.