Quick answers
What is this project?
DRI Unit of 2 X 350 TPD for production of Sponge iron 2,31,000 TPA, Induction Furnace of 4 X 15 T with CCM for production of 1,98,000 TPA of M.S. Billets, Rolling Mill for production of 3,30,000 TPA (600 TPD Hot Charge and 400 TPD Reheating Furnace) of TMT Bars, Wire Rod, Structure Steel, Strips etc., 32 MW of CPP (2 X 10MW WHRB & 1 X 12MW FBC) and Fly Ash Brick Plant by Sawadia Industries Pvt. Ltd is a proposed industrial project in Kopedih, Rajnandgaon, Chhattisgarh. The site covers 67.7 acres.
Who is building it?
The applicant is Sawadia Industries Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Apr 2024), as of 27 Nov 2026.
Where is it?
In Kopedih, Rajnandgaon, Chhattisgarh.
How big is it?
It has a stated cost of ₹250 crore and a site of 67.7 acres.
When was it filed?
The application was filed on 31 Jan 2024.
Project details
| Official title | Proposed installation of DRI Unit of 2 X 350 TPD for production of Sponge iron 2,31,000 TPA, Induction Furnace of 4 X 15 T with CCM for production of 1,98,000 TPA of M.S. Billets, Rolling Mill for production of 3,30,000 TPA (600 TPD Hot Charge and 400 TPD Reheating Furnace) of TMT Bars, Wire Rod, Structure Steel, Strips etc., 32 MW of CPP (2 X 10MW WHRB & 1 X 12MW FBC) and Fly Ash Brick Plant at village Kopedih, Tehsil Tedesara, District Rajnandgaon, Chhattisgarh by Sawadia Industries Pvt. Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 22 Apr 2024 |
| Application filed | 31 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sawadia Industries Private Limited |
| Land area | 67.7 acres (27.4 ha) |
| Project cost | ₹250 crore |
| Village / locality | Kopedih |
| Taluk / tehsil | Rajnandgaon |
| District | Rajnandgaon |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00137 |
In context
20 applications in Rajnandgaon since January 2022 are in the same category (Industry): 12 approved, 8 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 67.7 acres, this one is larger than 50% of them.
Where it is
Kopedih, Rajnandgaon, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield project of Sponge Iron 660000 TPA; MS Billets 465696 TPA; Rerolled… — environmental approval granted, 15 km away
- Setting-up new 2200 MTPD Ammonia & 3850 Urea fertilizer project of M/s GAIL… — cleared for impact study, 33.7 km away
- Industrial project by Nav Durga Fuel (P) Limited — environmental approval granted, 36.8 km away
- Proposed "increase in Production Capacity of Existing Dri Plant of 2 X 350 Tpd… — initial checks, 37.6 km away
- Proposed "increase in Production Capacity of Existing Dri Plant of 2 X 350 Tpd… — initial checks, 37.6 km away
- Expansion of Steel Plant and Regularization of partly constructed Iron Ore… — more information requested, 37.6 km away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — environmental approval granted, 38.6 km away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — returned to applicant, 38.6 km away
About this information