Quick answers
What is this project?
Greenfield project of Sponge Iron 660000 TPA; MS Billets 465696 TPA; Rerolled Steel Products through Hot Charging & Reheating Furnace 478500 TPA; Iron Ore Pellets 1.2 MTPA; SAF to produce SiMn 36000 TPA and/or FeMn 46000 TPA and/or FeSi 22,500 TPA and/or Pig iron 63000 TPA; Captive Power of 75MW (50MW thru WHRB & 25MW thru CFBC); Pipe Mill 155100 TPA; Galvanized Mill 155100 TPA and Fly Ash Bricks 41500 TPA by M/s. Kalyani Ispat Ltd is an approved industrial project in Kopedih, Rajnandgaon, Chhattisgarh. The site covers 307.1 acres.
Who is building it?
The applicant is Kalyani Ispat Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 May 2024), as of 27 Nov 2026.
Where is it?
In Kopedih, Rajnandgaon, Chhattisgarh.
How big is it?
It has a stated cost of ₹943 crore and a site of 307.1 acres.
When was it filed?
The application was filed on 23 Oct 2023.
Project details
| Official title | Greenfield project of Sponge Iron 660000 TPA; MS Billets 465696 TPA; Rerolled Steel Products through Hot Charging & Reheating Furnace 478500 TPA; Iron Ore Pellets 1.2 MTPA; SAF to produce SiMn 36000 TPA and/or FeMn 46000 TPA and/or FeSi 22,500 TPA and/or Pig iron 63000 TPA; Captive Power of 75MW (50MW thru WHRB & 25MW thru CFBC); Pipe Mill 155100 TPA; Galvanized Mill 155100 TPA and Fly Ash Bricks 41500 TPA located at Village-Kopideh, Tehsil & Dist.- Rajnandgaon (CG) by M/s. Kalyani Ispat Ltd. |
|---|---|
| Status | Environmental approval granted |
| Status since | 8 May 2024 |
| Application filed | 23 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Kalyani Ispat Limited |
| Land area | 307.1 acres (124.3 ha) |
| Project cost | ₹943 crore |
| Village / locality | Kopedih |
| Taluk / tehsil | Rajnandgaon |
| District | Rajnandgaon |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00177 |
In context
20 applications in Rajnandgaon since January 2022 are in the same category (Industry): 12 approved, 8 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 307.1 acres, this one is larger than 85% of them.
Where it is
Kopedih, Rajnandgaon, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- DRI Unit of 2 X 350 TPD for production of Sponge iron 2,31,000 TPA, Induction… — cleared for impact study, 15 km away
- Proposed "increase in Production Capacity of Existing Dri Plant of 2 X 350 Tpd… — initial checks, 23.2 km away
- Proposed "increase in Production Capacity of Existing Dri Plant of 2 X 350 Tpd… — initial checks, 23.2 km away
- Expansion of Steel Plant and Regularization of partly constructed Iron Ore… — more information requested, 23.2 km away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — environmental approval granted, 24.2 km away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — returned to applicant, 24.2 km away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — cleared for impact study, 24.2 km away
- M/s. SMS WATERGRACE ENVIROPROTECT PRIVATE LIMITED proposed a new CBMWTF at… — lapsed, 24.4 km away
More from Kalyani Ispat Limited in Rajnandgaon
- Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished… — environmental approval granted
- Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished… — cleared for impact study
All 3 Kalyani Ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.