What is Developing? Open the mapMap

Returned to applicantIndustry · Janjgir - Champa, Chhattisgarh

Greenfield project for production of Sponge Iron 231,000 TPA; MS Billets 232,848 TPA; Rerolled Steel Products through Hot Charging & through Reheating Furnace 225,863 TPA (171,144 TPA thru Hot Charging & 54,719 TPA through Billet Reheating Furnace); Captive Power of 25MW (16MW through WHRB & 9MW through AFBC); SiMn - 36,000 TPA and/or FeMn 46,000 TPA and/or Ferro Silicon 20,000 TPA and/or Pig iron 63,000 TPA from 9 MVA x 2 Nos SAF; and Fly Ash Bricks 36,700 TPA by M/s. VAP Ispat Pvt. Ltd.

Greenfield project for production of Sponge Iron 231,000 TPA; MS Billets 232,848 TPA; Rerolled Steel Products through Hot Charging & through Reheating Furnace 225,863 TPA (171,144 TPA thru Hot Charging & 54,719 TPA through Billet Reheating Furnace); Captive Power of 25MW (16MW through WHRB & 9MW through AFBC); SiMn - 36,000 TPA and/or FeMn 46,000 TPA and/or Ferro Silicon 20,000 TPA and/or Pig iron 63,000 TPA from 9 MVA x 2 Nos SAF; and Fly Ash Bricks 36,700 TPA by M/s. VAP Ispat Pvt. Ltd is a proposed industrial project in Mundpar, Nawagarh, Janjgir - Champa, Chhattisgarh. The site covers 414.4 acres. Its stated project cost is ₹325 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 27 Feb 2024).

See it on the live map All projects in Janjgir - Champa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield project for production of Sponge Iron 231,000 TPA; MS Billets 232,848 TPA;…

Project details

StatusReturned to applicant
Status since27 Feb 2024
Application filed8 Jan 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantVap Ispat Private Limited
Land area414.4 acres (167.7 ha)
Project cost₹325 crore
Village / localityMundpar
Taluk / tehsilNawagarh
DistrictJanjgir - Champa
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00335

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 6 Mar 2024Environmental approval granted191.1 acres₹325 crore
New project filed 8 Jan 2024 (this page)Returned to applicant414.4 acres₹325 crore

In context

13 applications in Janjgir - Champa since January 2022 are in the same category (Industry): 10 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 414.4 acres, this one is larger than 77% of them.

Where it is

Mundpar, Nawagarh, Janjgir - Champa, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.