Environmental approval grantedIndustry · Janjgir - Champa, Chhattisgarh

Greenfield project for production of Sponge Iron 231,000 TPA; MS Billets 232,848 TPA; Rerolled Steel Products through Hot Charging & through Reheating Furnace 225,863 TPA (171,144 TPA thru Hot Charging & 54,719 TPA through Billet Reheating Furnace); Captive Power of 25MW (16MW through WHRB & 9MW through AFBC); SiMn - 36,000 TPA and/or FeMn 46,000 TPA and/or Ferro Silicon 20,000 TPA and/or Pig iron 63,000 TPA from 9 MVA x 2 Nos SAF; and Fly Ash Bricks 36,700 TPA by M/s. VAP Ispat Pvt. Ltd.

Greenfield project for production of Sponge Iron 231,000 TPA; MS Billets 232,848 TPA; Rerolled Steel Products through Hot Charging & through Reheating Furnace 225,863 TPA (171,144 TPA thru Hot Charging & 54,719 TPA through Billet Reheating Furnace); Captive Power of 25MW (16MW through WHRB & 9MW through AFBC); SiMn - 36,000 TPA and/or FeMn 46,000 TPA and/or Ferro Silicon 20,000 TPA and/or Pig iron 63,000 TPA from 9 MVA x 2 Nos SAF; and Fly Ash Bricks 36,700 TPA by M/s. VAP Ispat Pvt. Ltd is an approved industrial project in Mundpar, Nawagarh, Janjgir - Champa, Chhattisgarh. The site covers 191.1 acres. Its stated project cost is ₹325 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 2 Jul 2024).

See it on the live map All projects in Janjgir - Champa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since2 Jul 2024
Application filed6 Mar 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantVap Ispat Private Limited
Land area191.1 acres (77.3 ha)
Project cost₹325 crore
Village / localityMundpar
Taluk / tehsilNawagarh
DistrictJanjgir - Champa
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01312

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 6 Mar 2024 (this page)Environmental approval granted191.1 acres₹325 crore
New project filed 8 Jan 2024Returned to applicant414.4 acres₹325 crore

In context

13 applications in Janjgir - Champa since January 2022 are in the same category (Industry): 10 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 191.1 acres, this one is smaller than 54% of them.

Where it is

Mundpar, Nawagarh, Janjgir - Champa, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.