Quick answers
What is Proposed Integrated Steel Plant (0.2673 MTPA Finished Steel?
Proposed Integrated Steel Plant (0.2673 MTPA Finished Steel is a lapsed industrial project in Kinjoli, Bakavand, Bastar, Chhattisgarh. The site covers 124.6 acres.
Who is building it?
The applicant is Nisarg Ispat Private Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Kinjoli, Bakavand, Bastar, Chhattisgarh.
How big is it?
It has a stated cost of ₹552.5 crore and a site of 124.6 acres.
When was it filed?
The application was filed on 10 Jul 2023.
Project details
| Official title | Proposed Integrated Steel Plant (0.2673 MTPA Finished Steel along with 36 MW Captive Power Plant) |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 10 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Nisarg Ispat Private Limited |
| Land area | 124.6 acres (50.4 ha) |
| Project cost | ₹552.5 crore |
| Village / locality | Kinjoli |
| Taluk / tehsil | Bakavand |
| District | Bastar |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00362 |
In context
7 applications in Bastar since January 2022 are in the same category (Industry): 3 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
Kinjoli, Bakavand, Bastar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Bastar Lime Stone, Marble and Other Stone (Dimension Stone) at… — not approved, 8.2 km away
- 400 kV D/c Jeypore-Jagdalpur Transmission Line (Chhattisgarh Portion) — lapsed, 9.4 km away
- 400 kV D/c Jeypore-Jagdalpur Transmission Line (Chhattisgarh Portion) — forest land use approved, 9.4 km away
- Retawand Sand Mine — lapsed, 9.6 km away
- Gufni Limestone Quarry — lapsed, 10.5 km away
- Gufni Limestone Quarry — not approved, 10.5 km away
- Gufni Limestone Quarry — lapsed, 10.5 km away
- Retawand Limestone Quarry — lapsed, 10.5 km away
All 5 Nisarg Ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.