What is this project?
400 kV D/c Jeypore-Jagdalpur Transmission Line (Chhattisgarh Portion) is a lapsed power project in Bedaumargaon, Bakavand, Bastar, Chhattisgarh. The site covers 43,166.4 acres.
Who is building it?
The applicant is Erwr Power Transmission Limited.
Has it been approved?
No. The application was lapsed on 9 Nov 2023, so it is no longer under consideration.
Where is it?
In Bedaumargaon, Bakavand, Bastar, Chhattisgarh.
How big is it?
It has a stated cost of ₹85.4 crore; a site of 43,166.4 acres and 11.1 acres (4.5 ha) of forest land.
When was it filed?
The application was filed on 9 Nov 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Nov 2023 |
| Application filed | 9 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Erwr Power Transmission Limited |
| Land area | 43,166.4 acres (17,468.8 ha) |
| Forest land | 11.1 acres (4.5 ha) |
| Project cost | ₹85.4 crore |
| Village / locality | Bedaumargaon |
| Taluk / tehsil | Bakavand |
| District | Bastar |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03769 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bedaumargaon, Bakavand, Bastar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 400 kV D/c Jeypore-Jagdalpur Transmission Line (Chhattisgarh Portion) — forest land use approved, 0 m away
- Korpal/Kanapal Sand Mine — lapsed, 4 km away
- Balputi Sand Mine — lapsed, 4.3 km away
- Kalcha Sand Mine — lapsed, 4.9 km away
- Kohkapal Sand Mine — lapsed, 5.3 km away
- Chitaloor Sand Mine (Area 2.0Hec), shri Abhishek jain — lapsed, 6.4 km away
- Proposed Integrated Steel Plant (0.2673 MTPA Finished Steel — lapsed, 9.4 km away
- Titirgaon Limestone Quarry — environmental approval granted, 10.1 km away
More from Erwr Power Transmission Limited in Bastar
- 400 kV D/c Jeypore-Jagdalpur Transmission Line (Chhattisgarh Portion) — forest land use approved
All 4 Erwr Power Transmission projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.