Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Sept 2025 |
| Application filed | 29 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vimal Agrawal |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹17 lakh |
| Village / locality | Kesdabri |
| Taluk / tehsil | Baloda Bazar |
| District | Baloda Bazar |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00552 |
In context
181 applications in Baloda Bazar since January 2022 are in the same category (Mining): 84 approved, 29 filed or under review, and 68 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 3.9 acres, this one is smaller than 78% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kesdabri, Baloda Bazar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Splitting of EC granted to M/s. Animesh Ispat Pvt. Ltd. vide order no. F. No.… — returned to applicant, 2.4 km away
- Transfer of Environment Clearance vide no. J-11011/420/2017-IA.II(I) dated… — environmental approval granted, 2.5 km away
- Amendment in Ec Pertaining to Reduction in Extent of Land From 9.949 Ha. to… — environmental approval granted, 2.5 km away
- Enhancement in production of Clinker from 3.5 MTPA to 4.1 MTPA through process… — initial checks, 4.5 km away
- Greenfield Cement Clinkerisation Plant (4.5 MTPA), Grinding Unit (1.0 MTPA),… — cleared for impact study, 7.5 km away
- Request for Change of Name from M/s Ambuja Cement Eastern Limited to M/s… — lapsed, 9 km away
- Proposed Parsabhadar Limestone Mine, Production Capacity 0.60 MTPA covering an… — environmental approval granted, 10 km away
- Proposed Parsabhadar Limestone Mine, Production Capacity 0.60 MTPA covering an… — cleared for impact study, 10 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.