Project details
| Official title | Proposed Parsabhadar Limestone Mine, Production Capacity 0.60 MTPA covering an area 28.461 ha. at near Village – Parsabhadar, Tehsil- Balodabazar, District - Balodabazar-Bhatapara, Chhattisgarh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 2 Feb 2026 |
| Application filed | 11 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S Nu Vista Limited |
| Land area | 70.3 acres (28.5 ha) |
| Project cost | ₹50 crore |
| Village / locality | Parsabhadar |
| Taluk / tehsil | Baloda Bazar |
| District | Baloda Bazar |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02454 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Nov 2025 (this page) | Environmental approval granted | 70.3 acres | ₹50 crore |
| Early planning filed 4 Apr 2023 | Cleared for impact study | 70.3 acres | ₹50 crore |
In context
181 applications in Baloda Bazar since January 2022 are in the same category (Mining): 84 approved, 29 filed or under review, and 68 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 70.3 acres, this one is larger than 90% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Parsabhadar, Baloda Bazar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Parsabhadar Limestone Mine, Production Capacity 0.60 MTPA covering an… — cleared for impact study, 0 m away
- Expansion in Production Capacity from 5.5 MTPA ROM to 9.00 MTPA ROM (Maximum… — environmental approval granted, 650 m away
- Enhancement in production of Cement Mill from 3.0 MTPA to 3.5 MTPA through… — initial checks, 2.3 km away
- Request for Change of Name from M/s Ambuja Cement Eastern Limited to M/s… — lapsed, 2.8 km away
- Mining project by M/s. Verma Material Suppliers — more information requested, 3.6 km away
- Mudhipar Lime Stone Quarry Project — cleared for impact study, 3.6 km away
- Mudhipar Limestone Quarry (Rakesh Verma) — environmental approval granted, 3.7 km away
- Rakesh Verma Limestone Quarry Mudipar — cleared for impact study, 3.7 km away
More from M/S Nu Vista Limited in Baloda Bazar
- Enhancement in production of Cement Mill from 3.0 MTPA to 3.5 MTPA through… — initial checks
- Expansion in Production Capacity from 5.5 MTPA ROM to 9.00 MTPA ROM (Maximum… — environmental approval granted
4 Nu Vista projects in Baloda Bazar
All 11 Nu Vista projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.