What is Developing? Open the mapMap

Cleared for impact studyIndustry · Raigarh, Chhattisgarh

Integrated Steel Plant - Iron Ore Beneficiation Plant (1 x 5.2 MTPA, Pellet Plant (1 x 3.8 MTPA), Producer Gas Plant (4,27,500 NM3/Hr.) -1496 MNm3/annum, Coal Washery Unit - 2 x 2.5 MTPA (5.0 MTPA), Coke Oven Unit 2 x 1.25 MTPA (2.5 MTPA), Lime Calcination Unit -2,64,000 TPA, Sinter Unit (3 x 150 m2) to produce sinter of 52,03,440 TPA, Blast Furnace Unit (3 x 1590 m3) to produce liquid metal of 47,22,300 TPA, DRI Kilns (4 x 600 TPD) – to produce sponge iron of 7,92,000 TPA, W

Integrated Steel Plant - Iron Ore Beneficiation Plant (1 x 5.2 MTPA, Pellet Plant (1 x 3.8 MTPA), Producer Gas Plant (4,27,500 NM3/Hr.) -1496 MNm3/annum, Coal Washery Unit - 2 x 2.5 MTPA (5.0 MTPA), Coke Oven Unit 2 x 1.25 MTPA (2.5 MTPA), Lime Calcination Unit -2,64,000 TPA, Sinter Unit (3 x 150 m2) to produce sinter of 52,03,440 TPA, Blast Furnace Unit (3 x 1590 m3) to produce liquid metal of 47,22,300 TPA, DRI Kilns (4 x 600 TPD) – to produce sponge iron of 7,92,000 TPA, W is a proposed industrial project in Sivpuri, Raigarh, Chhattisgarh. The site covers 738.9 acres. Its stated project cost is ₹8,917 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 21 Feb 2024).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Integrated Steel Plant - Iron Ore Beneficiation Plant (1 x 5.2 MTPA, Pellet Plant (1 x 3.8 MTPA), Producer Gas Plant (4,27,500 NM3/Hr.) -1496 MNm3/annum, Coal Washery Unit - 2 x 2.5 MTPA (5.0 MTPA), Coke Oven Unit 2 x 1.25 MTPA (2.5 MTPA), Lime Calcination Unit -2,64,000 TPA, Sinter Unit (3 x 150 m2) to produce sinter of 52,03,440 TPA, Blast Furnace Unit (3 x 1590 m3) to produce liquid metal of 47,22,300 TPA, DRI Kilns (4 x 600 TPD) – to produce sponge iron of 7,92,000 TPA, W is a proposed industrial project in Sivpuri, Raigarh, Chhattisgarh. The site covers 738.9 acres.

Who is building it?

The applicant is Nr Iron and Power Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 21 Feb 2024), as of 27 Nov 2026.

Where is it?

In Sivpuri, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹8,917 crore and a site of 738.9 acres.

When was it filed?

The application was filed on 28 Jun 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Integrated Steel Plant - Iron Ore Beneficiation Plant (1 x 5.2 MTPA, Pellet Plant (1 x…

Project details

Official titleEstablishment of Integrated Steel Plant - Iron Ore Beneficiation Plant (1 x 5.2 MTPA, Pellet Plant (1 x 3.8 MTPA), Producer Gas Plant (4,27,500 NM3/Hr.) -1496 MNm3/annum, Coal Washery Unit - 2 x 2.5 MTPA (5.0 MTPA), Coke Oven Unit 2 x 1.25 MTPA (2.5 MTPA), Lime Calcination Unit -2,64,000 TPA, Sinter Unit (3 x 150 m2) to produce sinter of 52,03,440 TPA, Blast Furnace Unit (3 x 1590 m3) to produce liquid metal of 47,22,300 TPA, DRI Kilns (4 x 600 TPD) – to produce sponge iron of 7,92,000 TPA, W
StatusCleared for impact study
Status since21 Feb 2024
Application filed28 Jun 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantNr Iron and Power Private Limited
Land area738.9 acres (299 ha)
Project cost₹8,917 crore
Village / localitySivpuri
Taluk / tehsilRaigarh
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00636

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Apr 2025Environmental approval granted738.9 acres₹8,917 crore
Early planning filed 28 Jun 2023 (this page)Cleared for impact study738.9 acres₹8,917 crore

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 738.9 acres, this one is larger than 92% of them.

50 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sivpuri, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Nr Iron and Power Private Limited in Raigarh

All 3 Nr Iron and Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.