Quick answers
What is this project?
Expansion of Karwahi Open cast Coal Mine (Gare Palma IV/7 Coal Mine) production capacity from 1.44 MTPA to 1.68 MTPA (Stage –II: 40% expansion) within the existing Mine lease under para 7 (ii) as per EIA Notification and its subsequent amendments till date by M/s Sarda Energy & Minerals Limited is an approved mining project in Bajarmura, Tamnar, Raigarh, Chhattisgarh. The site covers 684.7 acres.
Who is building it?
The applicant is Sarda Energy and Minerals Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Nov 2023), as of 27 Nov 2026.
Where is it?
In Bajarmura, Tamnar, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹81 crore and a site of 684.7 acres.
When was it filed?
The application was filed on 22 Nov 2023.
Project details
| Official title | Expansion of Karwahi Open cast Coal Mine (Gare Palma IV/7 Coal Mine) production capacity from 1.44 MTPA to 1.68 MTPA (Stage –II: 40% expansion) within the existing Mine lease under para 7 (ii) as per EIA Notification and its subsequent amendments till date, located at Village-Karwahi, Khamaria, Saraitola, Dholnara & Bajarmuda, Tehsil– Tamnar, District – Raigarh, Chattisgarh by M/s Sarda Energy & Minerals Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 22 Nov 2023 |
| Application filed | 22 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Sarda Energy and Minerals Limited |
| Land area | 684.7 acres (277.1 ha) |
| Project cost | ₹81 crore |
| Village / locality | Bajarmura |
| Taluk / tehsil | Tamnar |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00645 |
In context
230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 684.7 acres, this one is larger than 76% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 2,999.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Bajarmura, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Karwahi Open cast Coal Mine (Gare Palma IV/7 Coal Mine)… — lapsed, 0 m away
- Expansion of Karwahi Open cast Coal Mine (Gare Palma IV/7 Coal Mine)… — lapsed, 0 m away
- Revised EIA/EMP Report as per the provisions under para 7 (ii) (a) EIA… — environmental approval granted, 0 m away
- Expansion of Karwahi Open cast Coal Mine (Gore Palma IV/7 Coal Mine)… — environmental approval granted, 350 m away
- Diversion of 33.613 Ha Forest Land (33.608 Ha within lease area) and Railway… — more information requested, 350 m away
- Diversion of 33.513 Ha Forest Land for Coal Mining at our Gare Palma IV/7 Coal… — lapsed, 950 m away
- Expansion of Coal Washery Plant from 0.96 MTPA to 5.2 MTPA in two phases… — cleared for impact study, 1.2 km away
- Expansion of Coal Washery Plant from 0.96 MTPA to 5.2 MTPA in two phases… — environmental approval granted, 1.2 km away
More from Sarda Energy and Minerals Limited in Raigarh
- Expansion of Karwahi Open cast Coal Mine (Gore Palma IV/7 Coal Mine)… — environmental approval granted
- Transfer of EC for 1200 MW (4X300 MW) Coal Based Thermal Power Plant of M/s… — environmental approval granted
- Revised EIA/EMP Report as per the provisions under para 7 (ii) (a) EIA… — environmental approval granted
14 Sarda Energy & Minerals projects in Raigarh
All 20 Sarda Energy & Minerals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.