Quick answers
What is this project?
Transfer of EC for 1200 MW (4X300 MW) Coal Based Thermal Power Plant of M/s SKS Power Generation (Chhattisgarh) Ltd to M/s Sarda Energy & Minerals Ltd is an approved power project in Bijkot, Kharsia, Raigarh, Chhattisgarh. The site covers 874 acres.
Who is building it?
The applicant is Sarda Energy and Minerals Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Dec 2024), as of 27 Nov 2026.
Where is it?
In Bijkot, Kharsia, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹5,100 crore and a site of 874 acres.
When was it filed?
The application was filed on 20 Nov 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Dec 2024 |
| Application filed | 20 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Sarda Energy and Minerals Limited |
| Land area | 874 acres (353.7 ha) |
| Project cost | ₹5,100 crore |
| Village / locality | Bijkot |
| Taluk / tehsil | Kharsia |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00929 |
In context
29 applications in Raigarh since January 2022 are in the same category (Power): 13 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 874 acres, this one is larger than 50% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bijkot, Kharsia, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of 12.938 Ha Diverted Revenue Forest Land (4.805 Ha at vill- Binjkot… — in-principle approval, conditions pending, 400 m away
- Expansion of Existing Thermal Power Plant from 600 MW (2x300 MW) to 1200 MW… — under environmental review, 400 m away
- Santosh Kumar Dewangan — environmental approval granted, 1.9 km away
- Greenfield Project of Iron Ore Pelletization Plant (9,00,000 TPA), Sponge Iron… — environmental approval granted, 4 km away
- Greenfield Project of Iron Ore Pelletization Plant (9,00,000 TPA), Sponge Iron… — lapsed, 4 km away
- Greenfield Project of Wet Type Coal Washery based on Heavy Media cyclone of… — environmental approval granted, 4.4 km away
- Greenfield Project of Wet Type Coal Washery based on Heavy Media cyclone of… — cleared for impact study, 4.4 km away
- Proposed Greenfield Integrated Steel Plant with Iron Ore Beneficiation Plant… — cleared for impact study, 4.5 km away
More from Sarda Energy and Minerals Limited in Raigarh
- Expansion of Karwahi Open cast Coal Mine (Gore Palma IV/7 Coal Mine)… — environmental approval granted
- Expansion of Karwahi Open cast Coal Mine (Gare Palma IV/7 Coal Mine)… — environmental approval granted
- Revised EIA/EMP Report as per the provisions under para 7 (ii) (a) EIA… — environmental approval granted
14 Sarda Energy & Minerals projects in Raigarh
All 20 Sarda Energy & Minerals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.